GV

GeezerVison

The World Wide Web, restored to 800 pixels of glory.

Home|About|Gaming cabinet|Archives|How it works|Starter sites

On this site

  • Sign in
  • ActionsCI/CD and automation
  • CodespacesCloud development environments
  • All Features
  • Documentation
  • Training
  • Certifications
  • Build with Copilot
  • Customize Copilot
  • Integrations
  • Trending repos
  • GitHub Sponsors
  • Developer articles
  • Enterprises

This view

  • Original page
  • New address

GeezerVison is showing github.com — epic: ID/Atlas extensible primitives, federation, namespaces — major design iteration (2026-11-12 directive) · Issue #9106 · developing-today/code

epic: ID/Atlas extensible primitives, federation, namespaces — major design iteration (2026-11-12 directive) #9106

New issue
Copy link
New issue
Copy link
Todo
4 / 74 of 7 issues completed
Todo
epic: ID/Atlas extensible primitives, federation, namespaces — major design iteration (2026-11-12 directive)#9106
4 / 74 of 7 issues completed
Copy link
Labels
app/idPackage/app: id (pkgs/ or apps/ in this repo)epicMeta-issue grouping multiple items (org Project Type=Epic)epic/atlas-programReprioritization program epic (2026-11-12)epic/id-programReprioritization program epic (2026-11-12)status:to-do

Description

@dezren39
dezren39
opened on Nov 13, 2026
Issue body actions

Program: ID/Atlas extensible primitives, federation, namespaces

Source: Drew directive, 2026-11-12 18:29 CST (clarifies and greatly extends the hosted-editions program #9078). Filed via design-mill intake; the summit elaboration is queued as a design-mill task pointing at this issue.

What this program is

A new major design iteration for the ID substrate and its Atlas-facing surfaces, in three parts:

  • Part A — ID core (namespaces, ID shapes, triples, user attributes): the addressing and data model everything else stands on.
  • Part B — federation & trust: how peer servers exchange signed data, sync, fan out queries, and earn or lose trust.
  • Part C — Atlas-facing economics & discovery: storage benchmarks/economics, ID search, recommendations.

Program-level items (§0 extensibility architecture, §7 modes/configuration, refine-and-prioritize) sit directly under this epic.

Why three parts, not one flat list: the directive itself splits this way — one part Atlas, one part ID, one part the federation layer both share. The parts have different design tempos (Part A is data model, Part B is protocol/trust, Part C is measurement-driven) and different nearest neighbors (#2056 ID designs; #9083 tenancy; #8983 Atlas). One program epic keeps the statement inventory whole: nothing in the directive belongs to only one audience, and the summit owns cohesion across the parts.

Clarification of record (§0)

Extensibility IS the architecture goal. Primitives, adapters, and hooks are designed for the full matrix of stores / buckets / streams / transports from the start. What was de-prioritized in #9078/#9082's framing is implementing the long tail now — the earlier "plumbing, not a matrix" line stands as an implementation priority, NOT as an architecture limit. Both tier-1 editions (Rust binaries, Cloudflare/Turso hosted) are fully featured; neither is a reduced edition. Everything behavioral is configuration where it is behavior, primitives where it is mechanism (§7). Our system is not special: every capability is a config option anyone could replicate by investing the same effort.

Inputs / feeds

  • Feeds into and amends: epic: hosted editions — PM service, ID service, and fleet tool as workable Cloudflare Workers equivalents (multi-tenant Turso/R2 architecture) #9078 (hosted editions), design(id): store abstraction — Turso/SQLite-over-HTTP beside redb, IndexedDB evaluated (one interface, pluggable backends) #9082 (store abstraction), design(pm-stack): tenancy architecture — per-user Turso databases + central tenancy DB, served by Workers and Durable Objects #9083 (tenancy), design(pm-stack): content-addressed media/data plane — R2 dedup, reference-based access, GC when the last reference drops #9084 (content plane), design(fleet): second version in TypeScript — scope, WASM evaluation, transports (REST/WebSocket), and direct-Turso prudence rules #9085 (TS transports), Atlas starter design(atlas): Atlas v1 build-out — design-mill starter (proto design → full design set) #9091 and VFS design(atlas): virtual filesystem over the content-addressed store + aggregated file index (Basin/Parquet evaluation) #9100, ID epic epic: ID platform expansion — apps, comms, currency, hosting, boards (2026-10-28 directive, LIST 6–15) #2056 (parent).
  • Proto design scaffold: doc/ note merged with this intake (linked below once merged).
  • Statement inventory: numbered S0–S7 in the proto design; every statement maps to a component issue under this epic or to a named existing issue. Zero unmapped is the intake acceptance bar; the summit verifies it again (mill return-on-agreement).

Acceptance

  • Statement inventory verified complete by the summit + a fresh judge pass (zero unmapped).
  • Versioned designs (V1 = what exists today; V2+ layer the vision) merged under doc/ for each part, or the part explicitly folded into an existing design by amendment with the link recorded here.
  • Granular implementation issues filed under the component issues for everything implementable.
  • Open questions batched to Drew with options + a recommendation; defaults recorded, never stalled on.

Sub-issues

Collapse Sub-issuesSub-issues

4 of 74 of 7 Issues completed
Loading 7 sub-issues

Activity

Next
  1. dezren39
    added
    app/idPackage/app: id (pkgs/ or apps/ in this repo)
    epicMeta-issue grouping multiple items (org Project Type=Epic)
    epic/id-programReprioritization program epic (2026-11-12)
    epic/atlas-programReprioritization program epic (2026-11-12)
    on Nov 13, 2026
  2. developing-today commented on Nov 13, 2026

    @developing-today
    developing-todayBot
    on Nov 13, 2026 – with developing.today
    Contributor
    More actions

    CODE-2807

  3. dezren39
    added a parent issue on Nov 13, 2026
    • epic: ID platform expansion — apps, comms, currency, hosting, boards (2026-10-28 directive, LIST 6–15) #2056
  4. dezren39
    added sub-issues on Nov 13, 2026
    • epic(id): Part A — ID core: namespaces, ID shapes, triples, user attributes #9107
    • epic(id): Part B — federation & trust: peer classes, signed data, federated query, reputation #9108
    • epic(atlas): Part C — Atlas-facing: storage economics, benchmarks, ID search, recommendations #9109
    • design(id): extensibility architecture — primitive/adapter/hook boundary spec + backend conformance #9110
    • design(id): modes & configuration surface — modes, link kinds, storages, tiering as config #9111
    • plan: refine and prioritize the #9106 program — sequencing for quick results, nothing dropped #9112
  5. developing-today
    added
    status:in-review
    on Nov 13, 2026
  6. dezren39
    added a commit that references this issue on Nov 13, 2026

    Merge pull request #9184 from developing-today/design/id-atlas-primit…

    0c50fad
  7. developing-today
    removed
    status:in-review
    on Nov 13, 2026
  8. 94 remaining items

  9. dezren39
    removed
    queue/claimedQueue worker lifecycle state
    work/assignedQueue worker lifecycle state
    on Nov 17, 2026
  10. dezren39 commented on Nov 19, 2026

    @dezren39
    dezren39
    on Nov 19, 2026
    MemberAuthor
    More actions

    agent-note:v1
    state: parked
    task: 20306
    lane: code-i (OpenChamber scheduled lane, worker repo-worker-code)
    origin: openchamber-scheduled-lane
    stage: verified -> parked

    Fresh verification: #9112 and #9106 remain OPEN and assigned to Drew; PR #9238 is MERGED; #9078 and #9091 remain OPEN. Prior task state reserves a dedicated owner planning window and records that explicit dependency acceptance is unproven. Existing notes identify #10284 as the living tracker; no edits or worktree were started, and no sequence was redone. Parked pending Drew confirming the planning window and dependency acceptance being recorded. Existing parked labels on #9112 match; no sandbox backlog/sweep files touched.

  11. dezren39
    removed their assignment
    on Nov 20, 2026
  12. dezren39
    added 7 commits that reference this issue on Nov 22, 2026

    test(id): sync a signed record between two nodes and report a conflic…

    bda3c9e

    Merge pull request #12268 from developing-today/claude/id-wire-substr…

    78b2e2c

    Merge pull request #12621 from developing-today/felix/12232-walking-s…

    6605f71

    feat(id): B3 — drive the #9106 walking skeleton from the CLI (#12232)

    5bb1ab3

    docs(id): README five-steps for id walk; registry + plan catch up (#1…

    d09de31

    Merge pull request #12672 from developing-today/felix/12232-cli-reach

    ee92f4a

    feat(id-hosted-worker): reference record schema + access check (compo…

    1f56742
  13. developing-today-fleet commented on Nov 26, 2026

    @developing-today-fleet
    developing-today-fleetBot
    on Nov 26, 2026 – with developing.today fleet
    Contributor
    More actions

    Triage verdict (oc-code-01, 2026-11-26): already delivered; no duplicate program build-out or follow-on packet. Fresh revalidation: design PR #9238, approval-rebind PR #9416, and publisher-resume fix PR #10169 are MERGED; #9112 sequencing plan is CLOSED; #10284 remains OPEN as the living tracker, updated 2026-11-26. The existing record documents the 384/384 statement inventory, merged versioned designs, 126 granular implementation/research issues with queue tasks, and resolved publication gate. #9106 remains OPEN as the program epic, with remaining work routed item-by-item through those issues. No acceptance gap surfaced in this triage.

  14. developing-today-fleet commented on Nov 27, 2026

    @developing-today-fleet
    developing-today-fleetBot
    on Nov 27, 2026 – with developing.today fleet
    Contributor
    More actions

    Triage revalidation — Fleet lane code-h, 2026-11-27 (queue task 25662)

    Verdict: this duplicate coverage triage is already handled; #9106 remains OPEN as the program epic, not because its design-mill acceptance is unfinished. Fresh checks confirm PR #9238 (versioned design), PR #9416 (approval rebind), and PR #10169 (publisher resume fix) are MERGED; sequencing issue #9112 is CLOSED; living tracker #10284 remains OPEN for component work. The existing delivery record and 2026-11-26 triage note cover the statement inventory and granular work publication. Remaining program work proceeds through those child issues; no duplicate design build-out or follow-on task is warranted.

  15. developing-today-fleet
    added a sub-issue on Nov 27, 2026
    • ID program — full investigation, design completion & build-out (program tracking) #13240
  16. developing-today-fleet commented on Nov 27, 2026

    @developing-today-fleet
    developing-today-fleetBot
    on Nov 27, 2026 – with developing.today fleet
    Contributor
    More actions

    B27 slice landed for review: PR #16284 implements #10231 (public signed append-only claims/disputes log). 9/9 federation_b27 tests pass; registry + fmt clean. Closes #10231 on merge.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    app/idPackage/app: id (pkgs/ or apps/ in this repo)epicMeta-issue grouping multiple items (org Project Type=Epic)epic/atlas-programReprioritization program epic (2026-11-12)epic/id-programReprioritization program epic (2026-11-12)status:to-do

    Type

    No type

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions

      You are visitor 01402775 — GeezerVison does not store the pages you look up.
      Best viewed with Netscape Navigator 4.7 or Internet Explorer 6 at 800×600. No cookies required.