GV

GeezerVison

The World Wide Web, restored to 800 pixels of glory.

Home|About|Gaming cabinet|Archives|How it works|Starter sites

On this site

  • Sign in
  • ActionsCI/CD and automation
  • CodespacesCloud development environments
  • All Features
  • Documentation
  • Training
  • Certifications
  • Build with Copilot
  • Customize Copilot
  • Integrations
  • Trending repos
  • GitHub Sponsors
  • Developer articles
  • Enterprises

This view

  • Original page
  • New address

GeezerVison is showing github.com — id: validation — Phases 0–8 + platform completion acceptance audit · Issue #1075 · developing-today/code

id: validation — Phases 0–8 + platform completion acceptance audit #1075

New issue
Copy link
New issue
Copy link
Closed
Closed
id: validation — Phases 0–8 + platform completion acceptance audit#1075
Copy link
Assignees
dezren39
Labels
app/idPackage/app: id (pkgs/ or apps/ in this repo)effort/lLarge: multi-day or open-ended; expect staged check-inskind/testTest coverage, test infrastructure, or test-only fixesmeta/enrichedIntake review done: acceptance criteria, links, and normalized labels addednowOrg Project gate: active priority — orchestrator adds to the boardpriority/highImportant and time-sensitivesource/humanFiled directly by a humanstatus:done

Description

@dezren39
dezren39
opened on Oct 27, 2026
Issue body actions

Validation task: Phases 0–8 + platform completion

Drew (2026-10-26): make tasks to validate the delivered work and ensure the tests are thorough and pass.

Scope: audit Phases 0–8 (events/storage, membership, sync/relays, groups/encryption, tags/documents, invites/pull/CLI, connectivity, Open Design items — plan of record: doc/2026-10-11T11-08-42Z_design_remaining_work/plan-phases.md) and the platform-completion acceptance brief (doc/2026-10-14T_platform_completion/acceptance-brief.md, PRs #209–#213) against what is actually on main today.

Work:

  1. Walk every phase step / acceptance checkbox; mark each verified, broken, or untested, with evidence (test name, run, or repro).
  2. Run the full test layers (Rust unit + integration, web unit/typecheck, Playwright E2E, nix flake check for pkgs/id) and record the results on this issue.
  3. Where coverage is thin (a delivered feature with no test that would catch its regression), add the missing tests.
  4. File a separate issue for every failure or gap found — do not fix-and-hide inside this task — and link them here.

Exit: every in-scope item is either verified by a passing test or has its own tracked issue; the full-suite results are recorded on this issue. Known starting point: ProseMirror revision replication to peers is an accepted gap (#792) — verify the rest of the brief still holds.

Coordination (2026-10-26 reprioritization, per Drew): every id roadmap item now has its own GitHub issue, and priority encodes the order: (1) the path to Phase 12 — now + priority/high; (2) Phase 12 itself — next; (3) Phase 13 and long-term ideas — priority/low. The dashboard mirrors this list (org Project "Developing Today" #4, Area id-train; Grist Program roadmap, Area id). If this item turns out to be blocked, wrong, or superseded, park or close it with a note rather than letting it stall the queue — dropping an issue is always allowed; silently stalling is not.

Acceptance criteria

  • Every Phases 0–8 step and every platform-completion acceptance checkbox is marked verified, broken, or untested, with evidence (test name, run, or repro) recorded on this issue.
  • Full test layers are run and recorded here: Rust unit + integration, web unit/typecheck, Playwright E2E, and nix flake check for pkgs/id.
  • Delivered features with no regression-catching test gain one, or the gap is filed separately.
  • Every failure/gap has its own filed issue linked here (known accepted gap: ProseMirror revision replication, id phase-8/platform-completion: ProseMirror save revisions are signed and stored locally but never replicated to peers #792).

Activity

Next
  1. dezren39
    added
    kind/testTest coverage, test infrastructure, or test-only fixes
    status/needs-triageNot yet triaged; needs a first look
    source/humanFiled directly by a human
    priority/highImportant and time-sensitive
    on Oct 27, 2026
  2. developing-today commented on Oct 27, 2026

    @developing-today
    developing-todayBot
    on Oct 27, 2026 – with developing.today
    Contributor
    More actions

    CODE-218

  3. dezren39
    added
    app/idPackage/app: id (pkgs/ or apps/ in this repo)
    nowOrg Project gate: active priority — orchestrator adds to the board
    effort/lLarge: multi-day or open-ended; expect staged check-ins
    on Oct 27, 2026
  4. github-actions
    assigned
    dezren39
    on Oct 27, 2026
  5. dezren39 commented on Oct 27, 2026

    @dezren39
    dezren39
    on Oct 27, 2026
    MemberAuthor
    More actions

    Intake review

    Related: Plan of record: doc/2026-10-11T11-08-42Z_design_remaining_work/plan-phases.md · acceptance brief PRs #209–#213 · known gap: #792

    Notes: The widest of the four validation tasks (#1075–#1078, filed 2026-10-27). The acceptance brief is from 2026-10-14, so some checkboxes may have been overtaken by later phases — mark those superseded with a pointer rather than failed.

    Risks: Checkbox-by-checkbox auditing of eight phases is the largest single validation scope in the batch; partial coverage should be reported as coverage, not implied complete.

    Suggested approach: Work phase by phase, oldest first; keep a running results table on the issue; file gap issues as found (do not fix-and-hide inside this task, per the brief).

    Labels were already normalized by the filer (kind, source/human, status/needs-triage, priority, effort, app/id all present); this pass appended the acceptance criteria above and adds meta/enriched.

    🤖 Agent note · filed

    • Agent: fleet monitor
    • Session / ID: repo-fleet-monitor run 2026-10-26 22:19 CDT
    • Found via: monitor reconciliation (intake enrichment, protocol §5)
    • Task: Intake review — verified still live (filed this evening as part of Drew's roadmap/validation batch; no merged PR or commit resolves it), appended acceptance criteria, posted this review.
    • Expectation: done when the acceptance criteria above are met (effort class as labelled by the filer).
  6. dezren39
    added
    meta/enrichedIntake review done: acceptance criteria, links, and normalized labels added
    on Oct 27, 2026
  7. dezren39 commented on Oct 27, 2026

    @dezren39
    dezren39
    on Oct 27, 2026
    MemberAuthor
    More actions

    Sequencing (Drew's Phase 12 reprioritization, 2026-10-26): this audit is step 4 of the ordered Path-to-Phase-12 queue in #1235 — work it after #241-and-#551-CI-trust-steps, before the next step. The full order, the tier rules, and the drop rule live in #1235. Reminder of this issue's contract: verify the phase against its plan, add missing tests until the suite is thorough, and file a separate issue for every gap found — the follow-ups join the tier-1 queue.

  8. dezren39
    added
    queue/queuedHas a queued queue task
    work/assignedQueue worker lifecycle state
    queue/claimedQueue worker lifecycle state
    on Oct 27, 2026
  9. 79 remaining items

  10. dezren39
    removed
    status/in-progressQueue worker lifecycle state
    queue/claimedQueue worker lifecycle state
    work/assignedQueue worker lifecycle state
    on Oct 27, 2026
  11. dezren39 commented on Oct 27, 2026

    @dezren39
    dezren39
    on Oct 27, 2026
    MemberAuthor
    More actions

    🤖 Agent note · correction to the slice-4 closeout above (queue task 1256)

    One row of the closeout was wrong. The brief follow-up row "protocol questions" stated "#185, #183, #195 closed; #194 and #160 still open". Fresh verification (2026-10-27T15:05Z, gh issue view on each) shows all five are still OPEN: #194 (Seitan V2 Keybase server side), #185 (who may clear a tag claim), #160 (user subject for tags), #183 (persisted incremental tag index), #195 (document removal semantics). The brief's condition — resolve/document those questions before claiming the complete original plan — therefore remains unmet, tracked by those five open issues themselves. Nothing else in the closeout changes: every Phases 0–8 step and brief checkbox was walked, and every other gap has its own issue; the five protocol questions were always filed as their own issues, which is why #1075's own exit criteria (each item verified or separately tracked) still stand.

  12. dezren39
    marked this as blocked on Nov 1, 2026
    • id(ci): F11.4 fast CI lane under 15 minutes #551
  13. dezren39
    marked this as blocking on Nov 1, 2026
    • id: validation — Phase 9 portable platform #1076
  14. dezren39 commented on Nov 3, 2026

    @dezren39
    dezren39
    on Nov 3, 2026
    MemberAuthor
    More actions

    Correction/update to the #1075 acceptance evidence, based on fresh run 41488645351 on main 7297b5d354c8fdfa9dc1f226232e7b857af11b95 (2026-11-02): it does not reproduce the old silent integration-VM timeout. The job failed in nix flake check (full) before any VM boot. At 17:19:59Z Magic Nix Cache returned HTTP 418/ResourceExhausted; Nix disabled its proxy for 60 seconds and at 17:20:08Z reported missing substituters for private paths. Independently, the id build reported compile errors (including E0053 at src/world_ssh.rs:308 and E0624 at src/world_ssh.rs:921), plus web formatting drift; see run log. PR #1246 already raised the VM integration test globalTimeout to 3600 seconds. The corrected failure mode is pre-VM build/cache/format failure, not an integration timeout. Current preserved branch fixes the two remaining authored compile errors and formatter drift; validation is in progress in task 6572. Cache-policy follow-up is already owned/tracked by open issue #774; its existing direction is to remove Nix from Actions.

  15. dezren39 commented on Nov 3, 2026

    @dezren39
    dezren39
    on Nov 3, 2026
    MemberAuthor
    More actions

    Final update for the #1372 re-baseline

    Run 41488645351 failed before any VM boot: Magic Nix Cache returned 418 at 17:19:59Z (log 859–920), but Nix disabled the proxy and continued; the fatal checks were id/lib-test compile failures, web formatting, and shfmt/recipe drift (not an integration timeout). See the detailed line-by-line correction on #1372.

    PR #4696 is merged as e4af344. On the updated branch, all-target Rust check, web format, shfmt, and just-recipe drift checks passed. No post-fix full NixOS VM run is claimed; a renewed timeout verdict needs evidence that the VM actually booted. The 60-minute timeout from #1246 remains in place. Cache policy follow-up stays with #774 / Drew's direction to remove Nix from Actions.

  16. dezren39 commented on Nov 10, 2026

    @dezren39
    dezren39
    on Nov 10, 2026
    MemberAuthor
    More actions

    🤖 Agent note · verification outcome: FAIL (fail-fast, named) — nixos-integration check blocked by a failing id lib test

    • Agent: repo queue worker, lane code-e (repo-worker-code)
    • Task: task 14796 (small_fix) for issue id(ci): nixos-integration VM test still times out silently — #896 acceptance recurrence (nightly 40457980141) #1372 — run one completed nixos-integration verification on current main and record the outcome.
    • Outcome: the verification run completed and FAILED before the VM test could start. Lane code-u's run of nix build ./pkgs/id#checks.x86_64-linux.nixos-integration on origin/main fb97fae (systemd unit lane-u-14796-nix.service, log /tmp/lane-u-14796-nix.log) ended: the id-0.1.0 dependency build failed its lib test suite (3201 passed, 1 failed) on frames::tests::byte_refusal_does_not_spend_a_frame_token_or_increment_counters — panicked at src/frames.rs:404, left: RequestTooLarge, right: BudgetExhausted. The nixos-test-driver derivation then failed on that dependency.
    • Currency check by this lane: no changes to pkgs/id/src/frames.rs or pkgs/id/crates between fb97fae and current main e30e6bb (fb97 is an ancestor), so the failing code is identical on current main. A confirmatory local cargo test attempt timed out under heavy laptop compile contention and is not counted as evidence either way.
    • Follow-up filed: issue id: frames byte-refusal test fails on main (RequestTooLarge vs BudgetExhausted) — blocks id build + nixos-integration check #8354 tracks the frames test failure (error-variant precedence between the size and budget checks; frames.rs last touched by id(comms): budgets — app-wide, per-IP, per-ID, and per-counterparty overrides (P1 of #2032) #2247's configurable budgets). Issue id(ci): nixos-integration VM test still times out silently — #896 acceptance recurrence (nightly 40457980141) #1372 stays OPEN: its verification half remains blocked on id: frames byte-refusal test fails on main (RequestTooLarge vs BudgetExhausted) — blocks id build + nixos-integration check #8354 — once that lands, one clean nixos-integration run closes id(ci): nixos-integration VM test still times out silently — #896 acceptance recurrence (nightly 40457980141) #1372.
    • Links: task 14796 · issue id(ci): nixos-integration VM test still times out silently — #896 acceptance recurrence (nightly 40457980141) #1372 · issue id: frames byte-refusal test fails on main (RequestTooLarge vs BudgetExhausted) — blocks id build + nixos-integration check #8354 · issue id: validation — Phases 0–8 + platform completion acceptance audit #1075
  17. dezren39 commented on Nov 22, 2026

    @dezren39
    dezren39
    on Nov 22, 2026
    MemberAuthor
    More actions

    Follow-up record for the #1372 slice-1 finding (xaltha, 2026-11-22): the legibility half landed on main (named groups, per-group deadlines, logged wait targets in integration-test.nix); the blocker found by the 2026-11-10 verification (#8354) is closed; the one clean nixos-integration run that closes #1372 is still outstanding — the nightly route concluded cancelled on every run 2026-11-16→21, and no laptop/codespace build route is reachable from the recording seat. Full evidence and resume instructions: #1372 (comment)

  18. dezren39 commented on Nov 22, 2026

    @dezren39
    dezren39
    on Nov 22, 2026
    MemberAuthor
    More actions

    Follow-up record for the #1374 slice-1 finding (xaltha, 2026-11-22): criterion 1 (server readiness wait before the first curl) is met — PR #4667 merged 2026-11-10 (266fd9c), re-verified today against origin/main 7bfcaff. Criterion 2 (the check reaches and runs its Playwright suite in a full nix flake check) still awaits one real run: the nightly route concluded cancelled on every run 2026-11-16→21 and no laptop/codespace build route is reachable from the recording seat. Evidence and resume command: the 2026-11-22 state note on #1374.

  19. dezren39 commented on Nov 22, 2026

    @dezren39
    dezren39
    on Nov 22, 2026
    MemberAuthor
    More actions

    agent-note:v1 — #1374 follow-up state (from #1075 slice 1), recorded by agent felix, 2026-11-22.

    • id(ci): nixos-playwright-e2e VM test fails on first curl — no server readiness wait (nightly 40457980141) #1374 criterion 1 (readiness waits before the first curl): met by PR id(ci): retry cross-VM curl probes in playwright-e2e-test.nix #4667 (merged 2026-11-10) and re-verified on current main; the probes' legibility gap (unnamed driver-default 900 s deadline, timeout failure carrying no server state) is addressed by PR test(id): legible named-deadline cross-VM readiness probes in playwright-e2e VM test (#1374) #12581, open for review.
    • The status/blocked park on id(ci): nixos-playwright-e2e VM test fails on first curl — no server readiness wait (nightly 40457980141) #1374 was lifted by a decision record (no owner decision outstanding; the blocker was the nightly's 90-minute job timeout, removed by PR ci(id): raise the e2e nightly timeout from 90 to 300 minutes #12526's 300-minute timeout).
    • Criterion 2 (a full check run reaching the Playwright suite) awaits a completed run: nightly 45026136879 is in flight on current main. Its verdict on nixos-playwright-e2e will be recorded here and on id(ci): nixos-playwright-e2e VM test fails on first curl — no server readiness wait (nightly 40457980141) #1374 when it lands.
  20. dezren39 commented on Nov 22, 2026

    @dezren39
    dezren39
    on Nov 22, 2026
    MemberAuthor
    More actions

    Result recorded for #1374 (slice 1 follow-up), per its criterion 3 — Lane J2 closeout, 2026-11-22:

    • Criterion 1 (readiness wait before the first curl): met on main — PR id(ci): retry cross-VM curl probes in playwright-e2e-test.nix #4667 (merged 2026-11-10) added server-side wait_for_unit/wait_for_open_port plus bounded wait_until_succeeds retries for all four cross-VM probes in pkgs/id/nix/tests/playwright-e2e-test.nix.
    • Legibility hardening: met on main — PR test(id): legible named-deadline cross-VM readiness probes in playwright-e2e VM test (#1374) #12581 (merged 2026-11-22) named the probe deadline (120 s) and attaches server unit status + journal to a timeout failure. A parallel PR, id(ci): name the playwright-e2e readiness timeout, dump server journal on timeout #12580, was closed unmerged as superseded after a line-by-line comparison (recorded on id(ci): nixos-playwright-e2e VM test fails on first curl — no server readiness wait (nightly 40457980141) #1374 and on the PR); its only remainders are an ss -ltnp listeners dump and a longer journal tail, noted on id(ci): nixos-playwright-e2e VM test fails on first curl — no server readiness wait (nightly 40457980141) #1374 as micro-follow-up candidates.
    • Criterion 2 (the check reaches and runs its Playwright suite in a full run): still open — it awaits a completed id e2e nightly on main, the same vehicle id(ci): nixos-integration VM test still times out silently — #896 acceptance recurrence (nightly 40457980141) #1372 waits on; the 2026-11-22 main dispatch was cancelled by a superseding run. id(ci): nixos-playwright-e2e VM test fails on first curl — no server readiness wait (nightly 40457980141) #1374 stays open on this criterion alone.
  21. dezren39
    added a commit that references this issue on Nov 25, 2026

    Phase tracker: derive progress for Phases 0-10 (#13944)

    a366b11
  22. developing-today-fleet commented on Nov 26, 2026

    @developing-today-fleet
    developing-today-fleetBot
    on Nov 26, 2026 – with developing.today fleet
    Contributor
    More actions

    🤖 Agent note (lane code-j, 2026-11-26): the #1372 follow-up is resolved. nix flake check (full) passed on main @ 612fa379 in nightly run 45877069794, so nixos-integration passed. #1372 closed with this evidence.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

  • @dezren39
    dezren39

Labels

app/idPackage/app: id (pkgs/ or apps/ in this repo)effort/lLarge: multi-day or open-ended; expect staged check-inskind/testTest coverage, test infrastructure, or test-only fixesmeta/enrichedIntake review done: acceptance criteria, links, and normalized labels addednowOrg Project gate: active priority — orchestrator adds to the boardpriority/highImportant and time-sensitivesource/humanFiled directly by a humanstatus:done

Type

No type

Projects

No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions

    You are visitor 01402775 — GeezerVison does not store the pages you look up.
    Best viewed with Netscape Navigator 4.7 or Internet Explorer 6 at 800×600. No cookies required.