GV

GeezerVison

The World Wide Web, restored to 800 pixels of glory.

Home|About|Gaming cabinet|Archives|How it works|Starter sites

On this site

  • Sign in
  • ActionsCI/CD and automation
  • CodespacesCloud development environments
  • All Features
  • Documentation
  • Training
  • Certifications
  • Build with Copilot
  • Customize Copilot
  • Integrations
  • Trending repos
  • GitHub Sponsors
  • Developer articles
  • Enterprises

This view

  • Original page
  • New address

GeezerVison is showing github.com — id: Path to Phase 12 — ordered prerequisite queue (CI trust → validation → journal → visibility → remaining F11) · Issue #1235 · developing-today/code

id: Path to Phase 12 — ordered prerequisite queue (CI trust → validation → journal → visibility → remaining F11) #1235

New issue
Copy link
New issue
Copy link
Closed
Closed
id: Path to Phase 12 — ordered prerequisite queue (CI trust → validation → journal → visibility → remaining F11)#1235
Copy link
Assignees
dezren39
Labels
app/idPackage/app: id (pkgs/ or apps/ in this repo)effort/lLarge: multi-day or open-ended; expect staged check-insepicMeta-issue grouping multiple items (org Project Type=Epic)kind/featureNew feature or capability requestmeta/enrichedIntake review done: acceptance criteria, links, and normalized labels addedmode/onlineFully doable remotely: design, config, code, cloudnowOrg Project gate: active priority — orchestrator adds to the boardpriority/highImportant and time-sensitivesource/humanFiled directly by a humanstatus:donetask/triageQueue packet kind: verify, reproduce, and route this item

Description

@dezren39
dezren39
opened on Oct 27, 2026
Issue body actions

Path to Phase 12 — the ordered work queue

This issue is the single ordered queue for everything that must land before Phase 12 feature work starts. The roadmap (planning/roadmaps/id.md) points here; the repo queue claims work in this order (packet priorities encode the same sequence); the Phase 12 epic is #534.

How work is picked (so nobody has to guess)

  1. Tier 1 — this list, top to bottom. Labels: priority/high + now. Queue packets carry descending priorities matching the step numbers below, so the worker claims step 1 before step 2.
  2. Tier 2 — Phase 12 (label next): id: F12.1 apply wiring — module install + schedules reconciliation #807 F12.1, id(world): F12.2 world forking and templates #556 F12.2, id(world): F14.6 builder and moderator authority through session frames (F12.3 remainder) #835 F12.3 remainder, id: F12.4 provider registry — capabilities as manifest + provider components #1061 F12.4, id: F12.5 first new providers — kv, blob, http.fetch, notify #1062 F12.5, id: F12.6 audit log and OpenTelemetry export #1063 F12.6, id: F12.7 ABI specification and conformance suite #1064 F12.7, id: F12.8 guest SDKs — Rust + Zig/AssemblyScript, component-model decision #1065 F12.8, id: F12.9 program upgrade with state migration and rollback #1066 F12.9, id: F12.10 fair scheduling and per-account quotas #1067 F12.10, id: F12.11 delta and binary frames (screen patches, resume tokens) #805 F12.11, id(world): F12.12 many worlds per node: 1,000 idle / 100 active with a per-world memory budget #557 F12.12, id: F12.13 journal replication (read replicas over a signed stream) #806 F12.13, id: F12.14 portals — cross-world messaging by mutual grant #1068 F12.14, id: F12.15 id world dev: watch, rebuild, hot-swap, fixture replay, fuzz harness #558 F12.15, id: F12.16 id world doctor #559 done F12.16, id: F12.17 trust and provenance — module signatures against an admin trust list #1069 F12.17, id(world): F12.18 denial-of-service test suite in CI #560 F12.18. Designs run through id: Phase 12 designs to run through the research workflow #534 first.
  3. Tier 3 — Phase 13 + ideas (priority/low): id: Phase 13 F13.3 SSH-over-iroh reachability (and iroh-over-SSH fallback) #785–id: Phase 13 F13.8 multi-server, multi-client topology; client-only mode always supported #790, id: long-term — group encryption and authorization (BeeKEM / p2panda-encryption) #1070–id: idea — migrate the web UI from HTMX to Datastar #1073.

The order, and why

CI trust comes first because every validation verdict below is only as good as the test signal it reads. Validations then run in phase order — each audit produces the gap list the following work clears, and the earlier phases are the foundation the later ones extend. Journal compatibility (#227) precedes Phase 12 because worlds-as-data builds on the journal format.

  • Step 1 — Stabilize shared-state failures in Firefox E2E CI #229 Stabilize shared-state failures in Firefox E2E CI — DONE 2026-10-26 (queue worker, PR test(id): per-spec-file e2e isolation for the Firefox shared-state cluster (#229) #987, issue auto-closed on merge)
  • Step 2 — Bulk LogSync test retries a mid-stream reset instead of explaining it #241 Bulk LogSync test retries a mid-stream reset instead of explaining it (flaky CI test) — DONE 2026-10-28 (issue closed)
  • Step 3 — id(ci): F11.4 fast CI lane under 15 minutes #551 F11.4 fast CI lane under 15 minutes — DONE 2026-10-27 (issue closed)
  • Step 4 — id: validation — Phases 0–8 + platform completion acceptance audit #1075 Validate Phases 0–8 and the platform-completion brief (audit + tests) — DONE 2026-10-27 (issue closed)
  • Step 5 — id: validation — Phase 9 portable platform #1076 Validate Phase 9: portable screens, Roc libraries, collaboration (audit + tests) — DONE 2026-10-27 (issue closed)
  • Step 6 — id: validation — Phase 10 worlds as places #1077 Validate Phase 10: profiles, capability ceilings, roles, fixtures (audit + tests) — DONE 2026-10-27 (issue closed)
  • Step 7 — id: validation — delivered Phase 11 items (claimed-done audit) #1078 Validate the delivered Phase 11 items (audit + tests) — DONE 2026-10-27 (queue task 1259 audit complete, issue closed with the closeout table: 7 of 9 items verified by named passing tests; F11.4 regression filed as id(ci): F11.4 regression — fast-lane median PR feedback is 19m09s over the last ten runs (exit: under 15m) #1401, F11.5 partial tracked in id: F11.5 injected-clock exit criterion not literally met — polling sleeps remain in world tests #1326, F11.10 enforcement gap filed as id: F11.10 large-module split has no automated enforcement — add a production file-size check to the fast lane #1438)
  • Step 8 — Define rollback compatibility for world profile journal entries #227 Define rollback compatibility for world profile journal entries — DONE 2026-10-27 (issue closed)
  • Step 9 — id(world): F11.7 host metrics, Prometheus endpoint and tracing spans #553 F11.7 host metrics, Prometheus endpoint and tracing spans — DONE 2026-10-30 (PR feat(id): add admin-protected prometheus metrics and tracing spans #1715 merged; endpoint and tracing spans)
  • Step 10 — id(ci): F11.8 benchmark harness with committed baselines #539 F11.8 benchmark harness with committed baselines — DONE 2026-10-27 (issue closed)
  • Step 11 — id(world): F11.9 bytes-per-frame baseline table #542 F11.9 bytes-per-frame baseline table — DONE 2026-10-27 (PR test(id): F11.9 bytes-per-frame baseline for checked-in examples (#542) #1429 merged after CI passed)
  • Step 12 — id(roc): F11.15 smaller example modules (wasm-opt -Os, strip, <=400 KB) #555 F11.15 smaller example modules (wasm-opt -Os, strip, ≤400 KB) — DONE 2026-10-27 (PR id(roc): F11.15 smaller example modules — wasm-opt -Os + strip, all 7 rebuilt ≤400 KB (#555) #1453 merged after CI passed)
  • Step 13 — id(roc): F11.18 pin the Roc compiler for checked-in example modules and rebuild them in CI #541 F11.18 pin the Roc compiler for checked-in example modules and rebuild them in CI — DONE 2026-11-03 (PR id(roc): pin and rebuild checked-in example modules (#541) #3883 merged)
  • Step 14 — id(world): F11.16 replay self-check (id world verify) #544 F11.16 replay self-check (id world verify) — DONE 2026-10-27 (issue closed)
  • Continuous — id: Phase 12 designs to run through the research workflow #534 Phase 12 design workflow (designs land ahead of each F12 item's implementation)

Working rules for whoever picks these up

  • One issue per validation phase is deliberate: each audit's job is to verify its phase against its plan, add the missing tests, and file a separate issue for every gap found — the follow-ups are the real work list, and they join this queue by label (priority/high + now while Phase 12 is blocked on them).
  • Drop rule: any step that proves blocked, wrong, or superseded gets parked or closed with a note saying why, and the queue moves on. Never silently stall. Closing a step as superseded is always allowed; no permission needed.
  • If a step's audit finds the phase is NOT actually delivered, say so plainly on that issue and file the missing work — that is the audit succeeding, not failing.

Dashboard: org Project #4, Area id-train, Horizon Week. Mirrored in the Grist Program roadmap ("id — Path to Phase 12").

Activity

Next
  1. dezren39
    added
    kind/featureNew feature or capability request
    status/needs-triageNot yet triaged; needs a first look
    source/humanFiled directly by a human
    priority/highImportant and time-sensitive
    on Oct 27, 2026
  2. developing-today commented on Oct 27, 2026

    @developing-today
    developing-todayBot
    on Oct 27, 2026 – with developing.today
    Contributor
    More actions

    CODE-367

  3. dezren39
    added
    app/idPackage/app: id (pkgs/ or apps/ in this repo)
    nowOrg Project gate: active priority — orchestrator adds to the board
    epicMeta-issue grouping multiple items (org Project Type=Epic)
    effort/lLarge: multi-day or open-ended; expect staged check-ins
    on Oct 27, 2026
  4. github-actions
    assigned
    dezren39
    on Oct 27, 2026
  5. dezren39 commented on Oct 27, 2026

    @dezren39
    dezren39
    on Oct 27, 2026
    MemberAuthor
    More actions

    Queue state (2026-10-26 ~23:05 CDT): all 14 steps are enqueued in repo-health-code-pilot as triage packets at priority 90 (top of the design scale; the pre-existing queue standard is 70), enqueued in step order — task ids run #1247–#1268 in the agent queue. The worker claims highest-priority first, so tier 1 now preempts the older id-web bug queue; within the tier, this checklist + the sequence comments on #1075–#1078 carry the order. Each issue also carries queue/queued.

  6. dezren39
    added
    meta/enrichedIntake review done: acceptance criteria, links, and normalized labels added
    on Oct 27, 2026
  7. dezren39 commented on Oct 27, 2026

    @dezren39
    dezren39
    on Oct 27, 2026
    MemberAuthor
    More actions

    Intake review

    Related: Epic #534 (Phase 12), steps: #229 (Step 1), #241 (Step 2), #551 (Step 3), #1075–#1078 (validation steps), #227 (journal compatibility).

    Notes: This is the ordered prerequisite queue itself — a coordination artifact as much as a work item. It already carries priority/high + effort/l + the epic label; this pass added acceptance criteria and meta/enriched only. Note Step 3 (#551) currently has a queue blocker: its canonical triage dedupe key is held by an inert shadow-queue task (flagged by the fleet monitor this run for operator repair).

    Risks: The list decays if step issues close without this checklist being updated — whoever closes a step issue should tick it here in the same pass.

    Suggested approach: No separate implementation: work the steps top-down through the queue; review this list in the fleet's regular reporting.

  8. dezren39 commented on Oct 27, 2026

    @dezren39
    dezren39
    on Oct 27, 2026
    MemberAuthor
    More actions

    Correction + queue verification (2026-10-26 ~23:45 CDT, via direct DB read of agent.claim_repo_task): the claim order is priority ASC, then created_at ASC — lower priority number = claimed sooner. My earlier note on this issue ('priority 90, highest first') was exactly backwards: 90 is the LAST band. Fixed in the database: the 13 open steps now hold priorities 10–22 in step order (step 2 #241 = 10 … step 14 #544 = 22), ahead of the entire existing queue (next band is 30). Step 1 (#229) completed tonight by the queue worker (PR #987) and is checked off. Two enqueue lessons recorded: the dedupe key for #229 collided with its own completed Oct 25 task, and #551's triage key collided with a completed shadow-queue investigation (agent task 1064), so #551 was re-issued under the fix key as task 1283. Verified from agent.tasks: the head of repo-health-code-pilot is now steps 2–14 in order.

  9. dezren39
    added
    mode/onlineFully doable remotely: design, config, code, cloud
    on Nov 1, 2026
  10. 25 remaining items

  11. dezren39
    removed
    work/assignedQueue worker lifecycle state
    on Nov 4, 2026
  12. dezren39 commented on Nov 4, 2026

    @dezren39
    dezren39
    on Nov 4, 2026
    MemberAuthor
    More actions

    agent-note:v1
    state: done
    queue: repo-health-code-pilot
    task: 7223 (triage, worker repo-worker-code, lane c29174f1-48e0-4b13-b4ff-9b73ab67e9ab)
    by: openchamber-scheduled-lane
    at: 2026-11-04T02:22Z

    Triage complete. Steps 1-14 are all complete; the checklist was refreshed with closure dates and merged PR evidence. Phase 12 design epic #534 remains open/in progress, so #1235 remains open as its index. Removed the queue/claimed, status/in-progress, and work/assigned lifecycle labels from this issue now that task 7223 is terminal.

  13. dezren39 commented on Nov 8, 2026

    @dezren39
    dezren39
    on Nov 8, 2026
    MemberAuthor
    More actions

    Partial verification — staying open (2026-11-07 done-task-only audit, tracking: #7016).

    Queue task(s) [7223, 2510] were marked done, and some work did land:

    • PR fix(aggregator): /program/<id> 404 + researched project-page slices (#1186; partial #1124/#1125/#1126/#1128) #1305 — fix(aggregator): /program/ 404 + researched project-page slices (fix(aggregator): unknown /program/<id> renders Not found with HTTP 200 — return 404 #1186; partial docs(dashboard): build out the Basement cluster project section (/program/lab-cluster) #1124/docs(dashboard): build out the id platform project section (/program/id) #1125/docs(dashboard): build out the Repo fleet project section (/program/repo-fleet) #1126/docs(dashboard): build out the Cloud program / SaaS project section (/program/cloud-program) #1128) (merged 2026-10-27T05:47:42Z): fix(aggregator): /program/<id> 404 + researched project-page slices (#1186; partial #1124/#1125/#1126/#1128) #1305
    • PR id: bump journal header on first ExecutionProfile write (#227) #1353 — id: bump journal header on first ExecutionProfile write (Define rollback compatibility for world profile journal entries #227) (merged 2026-10-27T10:58:06Z): id: bump journal header on first ExecutionProfile write (#227) #1353
    • PR id(roc): F11.15 smaller example modules — wasm-opt -Os + strip, all 7 rebuilt ≤400 KB (#555) #1453 — id(roc): F11.15 smaller example modules — wasm-opt -Os + strip, all 7 rebuilt ≤400 KB (id(roc): F11.15 smaller example modules (wasm-opt -Os, strip, <=400 KB) #555) (merged 2026-10-27T18:15:19Z): id(roc): F11.15 smaller example modules — wasm-opt -Os + strip, all 7 rebuilt ≤400 KB (#555) #1453

    No merged change closes this issue's full scope, so the done status is not treated as completion. Remainder re-queued as triage task 11557.

  14. dezren39 commented on Nov 8, 2026

    @dezren39
    dezren39
    on Nov 8, 2026
    MemberAuthor
    More actions

    🤖 Agent note · picked up

    • Agent: repo queue worker, lane code-q (repo-worker-code)
    • Session / ID: cron repo-queue-worker-shift-q run 2026-11-07 20:37 CST; task 11924
    • Found via: queue claim · task 11924
    • Task: task 11924 for issue id: Path to Phase 12 — ordered prerequisite queue (CI trust → validation → journal → visibility → remaining F11) #1235 (triage). Fresh check: issue id: Path to Phase 12 — ordered prerequisite queue (CI trust → validation → journal → visibility → remaining F11) #1235 is OPEN, no hard-stop labels (held / user/owned / do-not-merge / do-not-auto-edit). Execution lane: direct.
    • Expectation: triage verdict recorded on issue id: Path to Phase 12 — ordered prerequisite queue (CI trust → validation → journal → visibility → remaining F11) #1235 this shift.
    • Links: task 11924 · issue id: Path to Phase 12 — ordered prerequisite queue (CI trust → validation → journal → visibility → remaining F11) #1235
  15. dezren39
    added
    work/assignedQueue worker lifecycle state
    queue/claimedQueue worker lifecycle state
    status/in-progressQueue worker lifecycle state
    on Nov 8, 2026
  16. dezren39 commented on Nov 8, 2026

    @dezren39
    dezren39
    on Nov 8, 2026
    MemberAuthor
    More actions

    🤖 Agent note · done — already fully satisfied, closing

    • Agent: repo queue worker, lane code-q (repo-worker-code)
    • Session / ID: cron repo-queue-worker-shift-q run 2026-11-07 20:37 CST; task 11924
    • Found via: queue claim · task 11924 (done-task-only re-triage)
    • Task: task 11924 for issue id: Path to Phase 12 — ordered prerequisite queue (CI trust → validation → journal → visibility → remaining F11) #1235 (triage).
    • Verdict: ALREADY DONE. Fresh re-verification 2026-11-08: every ordered step in issue id: Path to Phase 12 — ordered prerequisite queue (CI trust → validation → journal → visibility → remaining F11) #1235 is closed — steps 1-14 (Stabilize shared-state failures in Firefox E2E CI #229, Bulk LogSync test retries a mid-stream reset instead of explaining it #241, id(ci): F11.4 fast CI lane under 15 minutes #551, id: validation — Phases 0–8 + platform completion acceptance audit #1075, id: validation — Phase 9 portable platform #1076, id: validation — Phase 10 worlds as places #1077, id: validation — delivered Phase 11 items (claimed-done audit) #1078, Define rollback compatibility for world profile journal entries #227, id(world): F11.7 host metrics, Prometheus endpoint and tracing spans #553, id(ci): F11.8 benchmark harness with committed baselines #539, id(world): F11.9 bytes-per-frame baseline table #542, id(roc): F11.15 smaller example modules (wasm-opt -Os, strip, <=400 KB) #555, id(roc): F11.18 pin the Roc compiler for checked-in example modules and rebuild them in CI #541, id(world): F11.16 replay self-check (id world verify) #544 all CLOSED), matching the checked boxes in the issue body. The sole remaining unchecked item, "Continuous — id: Phase 12 designs to run through the research workflow #534 Phase 12 design workflow", is also satisfied: issue id: Phase 12 designs to run through the research workflow #534 is CLOSED (completed, 2026-11-04T02:21:32Z) after PR docs: capture Phase 12 (#534) research package intake #4672 merged the Phase 12 research/design package (evidence in issue id: Phase 12 designs to run through the research workflow #534 closing note, comment 6620798642). The earlier triage (task 7223) kept issue id: Path to Phase 12 — ordered prerequisite queue (CI trust → validation → journal → visibility → remaining F11) #1235 open as the index for issue id: Phase 12 designs to run through the research workflow #534, but issue id: Phase 12 designs to run through the research workflow #534 closed in the same minute that note was posted, so that reason no longer holds.
    • Action: closing issue id: Path to Phase 12 — ordered prerequisite queue (CI trust → validation → journal → visibility → remaining F11) #1235 as completed with this evidence. No remainder, no fix packet enqueued.
    • Links: task 11924 · issue id: Path to Phase 12 — ordered prerequisite queue (CI trust → validation → journal → visibility → remaining F11) #1235 · issue id: Phase 12 designs to run through the research workflow #534 · PR docs: capture Phase 12 (#534) research package intake #4672
  17. dezren39
    closed this as completedon Nov 8, 2026
  18. dezren39
    removed
    status/in-progressQueue worker lifecycle state
    queue/claimedQueue worker lifecycle state
    work/assignedQueue worker lifecycle state
    on Nov 8, 2026
  19. developing-today
    added
    status:done
    on Nov 8, 2026
  20. dezren39
    added 2 commits that reference this issue on Nov 14, 2026

    Merge pull request #10060 from developing-today/queue/fallback-9922-p…

    9ee7736

    Merge pull request #10285 from developing-today/queue/16681-9923-phas…

    d64d261
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

  • @dezren39
    dezren39

Labels

app/idPackage/app: id (pkgs/ or apps/ in this repo)effort/lLarge: multi-day or open-ended; expect staged check-insepicMeta-issue grouping multiple items (org Project Type=Epic)kind/featureNew feature or capability requestmeta/enrichedIntake review done: acceptance criteria, links, and normalized labels addedmode/onlineFully doable remotely: design, config, code, cloudnowOrg Project gate: active priority — orchestrator adds to the boardpriority/highImportant and time-sensitivesource/humanFiled directly by a humanstatus:donetask/triageQueue packet kind: verify, reproduce, and route this item

Type

No type

Projects

No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions

    You are visitor 01402775 — GeezerVison does not store the pages you look up.
    Best viewed with Netscape Navigator 4.7 or Internet Explorer 6 at 800×600. No cookies required.