GV

GeezerVison

The World Wide Web, restored to 800 pixels of glory.

Home|About|Gaming cabinet|Archives|How it works|Starter sites

On this site

  • Sign in
  • ActionsCI/CD and automation
  • CodespacesCloud development environments
  • All Features
  • Documentation
  • Training
  • Certifications
  • Build with Copilot
  • Customize Copilot
  • Integrations
  • Trending repos
  • GitHub Sponsors
  • Developer articles
  • Enterprises

This view

  • Original page
  • New address

GeezerVison is showing github.com — id(phase-14): More shells (mobile, native, hardware) — core topic (research + design) · Issue #6279 · developing-today/code

id(phase-14): More shells (mobile, native, hardware) — core topic (research + design) #6279

New issue
Copy link
New issue
Copy link
Open
Open
id(phase-14): More shells (mobile, native, hardware) — core topic (research + design)#6279
Copy link
Labels
app/idPackage/app: id (pkgs/ or apps/ in this repo)design/id-phase-14Design: id-phase-14 - all issues of this effort carry iteffort/lLarge: multi-day or open-ended; expect staged check-insepic/id-platformEpic: id-platform - all issues of this effort carry itepic/id-programReprioritization program epic (2026-11-12)kind/featureNew feature or capability requestmeta/enrichedIntake review done: acceptance criteria, links, and normalized labels addedpriority/lowNice to have; do when convenientsource/humanFiled directly by a humantask/triageQueue packet kind: verify, reproduce, and route this item
Milestone
ID Phase 14 - hosted, federated, local-first

Description

@dezren39
dezren39
opened on Nov 5, 2026
Issue body actions

More shells (mobile, native, hardware) — Phase 14 core topic (research + design)

Filed from the next-horizons discussion #1240, decided by Drew on 2026-11-05: all themes are planned. This issue is the core topic for More shells (mobile, native, hardware). Its job is research and design — broaden the idea beyond what is already understood, set up multiple next steps, and produce implementation plans. No implementation starts here; the output is design documents and implementation issues.

Drew's principles for everything in Phase 14 (from #1240, 2026-11-05)

  • Local-first is always the goal, AND a hosted version is intended: central coordination supporting a large graph of broadly accessible objects.
  • Anything built must be completely usable by others hosting a small or large server themselves. P2P-hosted worlds and data behave the same as a large hosted public server; differences live in backend scale elements and access controls.
  • Users connect to each other and transfer/interact directly wherever possible, so hosted resources are an offloadable backstop, not a requirement. The app must not technically need us to function. Collaborative / shared / federated / local-first / p2p.
  • Our hosted instance is essentially public; other operators open theirs only as much as they want. Publishing paths: share to a big server, publish on pkarr, or self-host. All comms through iroh on the backend; first-class clients.

The idea, broadened

Phase 13 made shells a contract; this topic spends it. Broaden beyond 'more clients': each shell is a capability statement — what a phone can honestly present, what offline means for a journaled world, what a hardware terminal (the ESP32 wing line of work) does to input and attention. The conformance suite is the product: a new shell is done when it passes, not when it demos.

Research questions (first pass)

  • Mobile web/PWA: offline read model for world state, reconnect and catch-up semantics, push/notify via F12.5 providers
  • Native shells: what id: idea — native GUI client #1072's research concluded; share of code between web, native and TUI shells (frame layer vs presentation layer)
  • Hardware shells: ESP32-class constraints (screen, input, power) — which world interactions survive at that size
  • Shell capability providers (F13.7, id: Phase 13 F13.7 client-side capability providers under the ceiling model #789) as the extension point for shell-specific powers (camera, files, sensors)

Dependencies and existing pieces

Builds on Phase 13 (F13.1 contract done, #788 F13.6 native shells, #789 F13.7 capability providers), #1071 TUI, #1072 native GUI. Conformance check from F13.1 is the gate for every shell here.

Next steps — the version ladder

  • v1 — first-iteration design — its own issue, filed in the same pass and linked in the first comment below
  • v2 — outline: native & TUI completion — its own issue, filed in the same pass and linked in the first comment below
  • v3 — outline: hardware shell — its own issue, filed in the same pass and linked in the first comment below
  • v4 — outline: third-party shells — its own issue, filed in the same pass and linked in the first comment below

Plus a standing rule for this topic: anything the research surfaces that doesn't fit v1–v4 gets its own issue (Drew's rule: every feature, concept, or idea gets an issue), and future investigations are listed as comments here rather than lost.

Sequencing

Design queue order: F12.4 provider registry (#1061) and F12.10 scheduling/quotas (#1067) designs land first; Phase 14 v1 designs then run hosted worlds → discovery → agents spike → the rest. Implementation follows Phase 13. The drop rule applies throughout: anything that proves blocked, wrong, or superseded gets parked or closed with a note — never a silent stall.

Acceptance criteria

  • A research + design output exists for More shells (mobile, native, hardware): design documents broadening the topic beyond the current understanding, per the Phase 14 principles in the body (local-first plus hosted coordination).
  • Multiple concrete next steps are produced as implementation plans / implementation issues filed from this topic.
  • No implementation starts under this issue itself (per its own charter).

Activity

Next
  1. dezren39
    added
    kind/featureNew feature or capability request
    status/needs-triageNot yet triaged; needs a first look
    source/humanFiled directly by a human
    priority/lowNice to have; do when convenient
    app/idPackage/app: id (pkgs/ or apps/ in this repo)
    effort/lLarge: multi-day or open-ended; expect staged check-ins
    on Nov 5, 2026
  2. developing-today commented on Nov 5, 2026

    @developing-today
    developing-todayBot
    on Nov 5, 2026 – with developing.today
    Contributor
    More actions

    CODE-1845

  3. dezren39 commented on Nov 5, 2026

    @dezren39
    dezren39
    on Nov 5, 2026
    MemberAuthor
    More actions

    Version ladder for this topic (filed in the same pass, 2026-11-05):

    • v1: id(phase-14): More shells (mobile, native, hardware) — v1 — first-iteration design #6296
    • v2: id(phase-14): More shells (mobile, native, hardware) — v2 — outline: native & TUI completion #6297
    • v3: id(phase-14): More shells (mobile, native, hardware) — v3 — outline: hardware shell #6298
    • v4: id(phase-14): More shells (mobile, native, hardware) — v4 — outline: third-party shells #6299

    Phase 14 plan of record: #6312. Discussion of record: #1240.

  4. dezren39
    added
    meta/enrichedIntake review done: acceptance criteria, links, and normalized labels added
    on Nov 6, 2026
  5. dezren39 commented on Nov 6, 2026

    @dezren39
    dezren39
    on Nov 6, 2026
    MemberAuthor
    More actions

    Intake review

    • Related: Phase 14 core-topic set filed from discussion id: next horizons — what comes after Phase 13 (discussion with Drew) #1240 (siblings id(phase-14): Hosted worlds & always-on hosting — core topic (research + design) #6276–id(phase-14): Program ecosystem (share, fork, gallery) — core topic (research + design) #6278, id(phase-14): Agents in worlds (MCP bridge) — core topic (research + design) #6280–id(phase-14): Creator tooling & insight — core topic (research + design) #6282); Drew's 2026-11-05 decision recorded in the body: all themes are planned.
    • Notes: Still live at intake — research/design topic, no merged PR resolves it. Labels were already normalized at filing (kind/feature, source/human, priority/low, effort/l, app/id); this pass appends the missing acceptance criteria and marks meta/enriched.
    • Risks: open-ended research topics stall silently; the acceptance bar is the produced design output + filed implementation issues, not code.
    • Suggested approach: timebox a research pass, write the design doc, and file the implementation issues as this topic's deliverable.

    🤖 Fleet monitor intake (repo-fleet-monitor), 2026-11-06.

  6. dezren39 commented on Nov 6, 2026

    @dezren39
    dezren39
    on Nov 6, 2026
    MemberAuthor
    More actions

    🤖 Agent note · picked up

    • Agent: queue worker (repo-worker-code), lane code-r
    • Session / ID: task 11051
    • Found via: queue claim
    • Task: task 11051 — triage of issue id(phase-14): More shells (mobile, native, hardware) — core topic (research + design) #6279 (Phase 14 core topic: more shells): verify ladder/dependency state at current main, record blockers and ordering on the issue.
    • Expectation: triage findings posted; fix/design path scoped
    • Links: issue id(phase-14): More shells (mobile, native, hardware) — core topic (research + design) #6279
  7. dezren39
    added
    work/assignedQueue worker lifecycle state
    queue/claimedQueue worker lifecycle state
    status/in-progressQueue worker lifecycle state
    and removed
    status/needs-triageNot yet triaged; needs a first look
    on Nov 6, 2026
  8. 68 remaining items

  9. dezren39
    added a commit that references this issue on Nov 14, 2026

    Merge pull request #8243 from developing-today/queue/12931-6279-more-…

    49911d0
  10. dezren39 commented on Nov 17, 2026

    @dezren39
    dezren39
    on Nov 17, 2026
    MemberAuthor
    More actions

    Triaged: queue task 18456 (bulk-intake triage of issue #6279), Muse lane code-b, 2026-11-17.

    Verdict: already triaged of record (labels carry the triage: priority/low, effort/l, kind/feature; no status/needs-triage, no hard-stop labels). The v1 first-iteration design record for More shells was produced by task 12931 (done) for vehicle issue #6296 and landed in PR #8243, MERGED 2026-11-14T21:03:24Z — every v1 shell specified as a capability statement against shell-contract v1 with the F13.1 conformance gate, Phase 14 principles carried as constraints.

    Fresh this shift: sequencing gate #1061 is now CLOSED; #1067 remains OPEN. Issue #6279 stays open as the core-topic umbrella: the v2–v4 ladder issues #6297, #6298, #6299 are all OPEN and get their own design records when those rungs start, and vehicle #6296 remains OPEN for its remaining scope. No new follow-on packet is needed from this triage — the ladder issues are the routing.

  11. dezren39 commented on Nov 17, 2026

    @dezren39
    dezren39
    on Nov 17, 2026
    MemberAuthor
    More actions

    🤖 Agent note · link record

    • Agent: queue worker (repo-worker-code), lane any-k
    • Session / ID: task 18464
    • Found via: queue claim (triage of issue id(phase-14): More shells (mobile, native, hardware) — v1 — first-iteration design #6296)
    • Task: Linking the id(phase-14): More shells (mobile, native, hardware) — v1 — first-iteration design #6296 v1 design breakdown into this core topic, per the id(phase-14): More shells (mobile, native, hardware) — v1 — first-iteration design #6296 deliverable ("breakdown of implementation issues for this step, linked from this issue and the core topic").
    • Links: issue id(phase-14): More shells (mobile, native, hardware) — v1 — first-iteration design #6296 · PR docs(id): More shells v1 first-iteration design record (#6296, Phase 14 topic #6279) #8243 · slices id(phase-14): shells v1 slice 1 — PWA offline read model + catch-up in the browser shell (#6296) #10927, id(phase-14): shells v1 slice 2 — first native shell (Linux desktop) on the shared frame layer (#6296) #10928, id(phase-14): shells v1 slice 3 — ESP32-class hardware shell spike (#6296) #10929, id(phase-14): shells v1 slice 4 — notification capability provider (F12.5) for the mobile shell (#6296) #10930, id(phase-14): shells v1 slice 5 — conformance-suite packaging for v1 shells (#6296) #10931

    The More shells v1 design record (doc/2026-11-10T20-40-00Z_design_more_shells_v1/, PR #8243 merged 2026-11-14) named five follow-on implementation slices; they were filed this run as issues #10927 (PWA offline read model), #10928 (first native shell, Linux desktop), #10929 (ESP32-class hardware spike), #10930 (notification capability provider, F12.5), and #10931 (conformance-suite packaging). Issue #6296 closes with its deliverable complete; the slices carry the record's review constraints and the #1067 hosted stop rule.

  12. dezren39
    added
    queue/claimedQueue worker lifecycle state
    work/assignedQueue worker lifecycle state
    status/in-progressQueue worker lifecycle state
    on Nov 17, 2026
  13. dezren39 commented on Nov 17, 2026

    @dezren39
    dezren39
    on Nov 17, 2026
    MemberAuthor
    More actions

    Agent note — triage concurrence (lane any-j, task 19971)

    State: triaged — this packet is the triage follow-on of task 18456, and its triage of record (comment 6936982601, 2026-11-17T03:15Z) stands. Verified fresh this shift:

    • Issue id(phase-14): More shells (mobile, native, hardware) — core topic (research + design) #6279 OPEN as the Phase-14 core-topic umbrella; labels carry the triage (priority/low, effort/l, kind/feature, design/id-phase-14); no hard-stop labels, no status/needs-triage.
    • PR docs(id): More shells v1 first-iteration design record (#6296, Phase 14 topic #6279) #8243 MERGED 2026-11-14T21:03:24Z — the v1 first-iteration More-shells design record (task 12931, for vehicle issue id(phase-14): More shells (mobile, native, hardware) — v1 — first-iteration design #6296) is landed.
    • The v2–v4 ladder issues id(phase-14): More shells (mobile, native, hardware) — v2 — outline: native & TUI completion #6297, id(phase-14): More shells (mobile, native, hardware) — v3 — outline: hardware shell #6298, id(phase-14): More shells (mobile, native, hardware) — v4 — outline: third-party shells #6299 are all OPEN — they are the routing; each gets its own design record when its rung starts. No new follow-on packet from this triage.
    • Sequencing gates as the triage recorded: id: F12.4 provider registry — capabilities as manifest + provider components #1061 CLOSED, id: F12.10 fair scheduling and per-account quotas #1067 still OPEN.
    • One change since the triage note: vehicle id(phase-14): More shells (mobile, native, hardware) — v1 — first-iteration design #6296 has since CLOSED (it was open for remaining scope at triage time). This does not change the disposition — the umbrella stays open for the ladder rungs above.
  14. dezren39
    removed
    status/in-progressQueue worker lifecycle state
    queue/claimedQueue worker lifecycle state
    work/assignedQueue worker lifecycle state
    on Nov 17, 2026
  15. dezren39
    removed their assignment
    on Nov 20, 2026
  16. dezren39 commented on Nov 24, 2026

    @dezren39
    dezren39
    on Nov 24, 2026
    MemberAuthor
    More actions

    Second-pass verify (lane code-h, task 21875), fresh state 2026-11-24:

    Verdict: umbrella open and correctly routed — no packet from this pass.

    • Issue OPEN as the Phase-14 core-topic umbrella; v1 first-iteration design record merged via PR docs(id): More shells v1 first-iteration design record (#6296, Phase 14 topic #6279) #8243 (2026-11-14).
    • Slice progress since the 18456/19971 triages: 2 of 5 v1 slices CLOSED (id(phase-14): shells v1 slice 2 — first native shell (Linux desktop) on the shared frame layer (#6296) #10928 native shell, id(phase-14): shells v1 slice 3 — ESP32-class hardware shell spike (#6296) #10929 hardware spike); 3 OPEN (id(phase-14): shells v1 slice 1 — PWA offline read model + catch-up in the browser shell (#6296) #10927 PWA offline, id(phase-14): shells v1 slice 4 — notification capability provider (F12.5) for the mobile shell (#6296) #10930 notifications, id(phase-14): shells v1 slice 5 — conformance-suite packaging for v1 shells (#6296) #10931 conformance packaging).
    • Ladder v2–v4 (id(phase-14): More shells (mobile, native, hardware) — v2 — outline: native & TUI completion #6297, id(phase-14): More shells (mobile, native, hardware) — v3 — outline: hardware shell #6298, id(phase-14): More shells (mobile, native, hardware) — v4 — outline: third-party shells #6299) all OPEN for their own future records; sequencing gate id: F12.10 fair scheduling and per-account quotas #1067 still OPEN.
    • No follow-on packet: the routing already exists as the slice/ladder issues, each with its own queue lifecycle — filing from this umbrella pass would duplicate them. Umbrella stays open for the remaining slices and ladder rungs.
  17. developing-today-fleet commented on Nov 26, 2026

    @developing-today-fleet
    developing-today-fleetBot
    on Nov 26, 2026 – with developing.today fleet
    Contributor
    More actions

    Triage revalidation — code-j, 2026-11-26 (queue task 24835)

    Verdict: the umbrella remains OPEN and correctly routed; no new packet from this pass. The umbrella charter is research/design plus next-step routing, not implementation itself. The current ladder and its component issues carry the work.

    Fresh state:

    • v1 id(phase-14): More shells (mobile, native, hardware) — v1 — first-iteration design #6296 is CLOSED; v1 design PR docs(id): More shells v1 first-iteration design record (#6296, Phase 14 topic #6279) #8243 is merged. Slices id(phase-14): shells v1 slice 2 — first native shell (Linux desktop) on the shared frame layer (#6296) #10928, id(phase-14): shells v1 slice 3 — ESP32-class hardware shell spike (#6296) #10929 and id(phase-14): shells v1 slice 5 — conformance-suite packaging for v1 shells (#6296) #10931 are CLOSED. id(phase-14): shells v1 slice 1 — PWA offline read model + catch-up in the browser shell (#6296) #10927 remains OPEN with implementation task 24504 actively claimed. id(phase-14): shells v1 slice 4 — notification capability provider (F12.5) for the mobile shell (#6296) #10930 remains OPEN even though its notify-then-resync implementation merged in PR id(web): resync from client.notify hints #15104; a triage task (25085) is queued to reconcile that issue state.
    • v2 id(phase-14): More shells (mobile, native, hardware) — v2 — outline: native & TUI completion #6297 remains OPEN as the container for the delivered outline (PR design(id): more shells v2 outline — native & TUI completion (#6297) #12816) and its child work. id(phase-14): shells v2 slice 2 — TUI client feature completion on the shell contract (#6297) #12818 remains OPEN with its slices blocked; id(phase-14): shells v2 slice 3 — native GA packaging, distribution, and release gate (#6297) #12819 and id(phase-14): shells v2 slice 5 — conformance suite extension to the v2 shells (#6297) #12821 remain OPEN with triage tasks queued. id(phase-14): shells v2 slice 1 — second native target on the shared frame layer (#6297) #12817 and id(phase-14): shells v2 slice 4 — mobile-native decision record (#6297) #12820 are CLOSED.
    • v3 id(phase-14): More shells (mobile, native, hardware) — v3 — outline: hardware shell #6298 remains OPEN/parked behind id(phase-14): More shells (mobile, native, hardware) — v2 — outline: native & TUI completion #6297; task 13826 is blocked. v4 id(phase-14): More shells (mobile, native, hardware) — v4 — outline: third-party shells #6299 remains OPEN/blocked behind id(phase-14): More shells (mobile, native, hardware) — v3 — outline: hardware shell #6298; task 15244 is blocked.
    • Sequencing gate id: F12.10 fair scheduling and per-account quotas #1067 remains OPEN; its benchmark/scheduling follow-up remains blocked pending the matched-work slice perf(id): add a hub-level fair guest scheduler #15577 (task 21524).

    The v1/v2 follow-ups and the v3/v4 dependency chain remain individually represented, so an umbrella-level packet would duplicate existing routing. Keep #6279 open until the remaining planned slices and ladder rungs are dispositioned. No code changed.

  18. developing-today-fleet commented on Nov 27, 2026

    @developing-today-fleet
    developing-today-fleetBot
    on Nov 27, 2026 – with developing.today fleet
    Contributor
    More actions

    Triage revalidation — OpenChamber any-o, 2026-11-27 (queue task 25350)

    Verdict unchanged: #6279 remains the open Phase-14 core-topic umbrella, correctly routed; no new follow-on packet. The existing triage of record is task 24835 (comment #6279 (comment)); its component issues and v2–v4 ladder already carry next steps, so another umbrella packet would duplicate them.

    Fresh GitHub state checked 2026-11-27:

    • v1 vehicle id(phase-14): More shells (mobile, native, hardware) — v1 — first-iteration design #6296 is CLOSED. Its slices id(phase-14): shells v1 slice 2 — first native shell (Linux desktop) on the shared frame layer (#6296) #10928 (native), id(phase-14): shells v1 slice 3 — ESP32-class hardware shell spike (#6296) #10929 (hardware), and id(phase-14): shells v1 slice 5 — conformance-suite packaging for v1 shells (#6296) #10931 (conformance packaging) are CLOSED; id(phase-14): shells v1 slice 1 — PWA offline read model + catch-up in the browser shell (#6296) #10927 (PWA offline) and id(phase-14): shells v1 slice 4 — notification capability provider (F12.5) for the mobile shell (#6296) #10930 (notifications) remain OPEN.
    • PR id(web): resync from client.notify hints #15104 (notify-then-resync) is MERGED (2026-11-26), while id(phase-14): shells v1 slice 4 — notification capability provider (F12.5) for the mobile shell (#6296) #10930 remains OPEN. The prior triage identified #25085 as its reconciliation task; do not duplicate that follow-up here.
    • v2 id(phase-14): More shells (mobile, native, hardware) — v2 — outline: native & TUI completion #6297, v3 id(phase-14): More shells (mobile, native, hardware) — v3 — outline: hardware shell #6298, and v4 id(phase-14): More shells (mobile, native, hardware) — v4 — outline: third-party shells #6299 remain OPEN; sequencing gate id: F12.10 fair scheduling and per-account quotas #1067 remains OPEN.

    No code changed. Keep #6279 open as the umbrella until the remaining slices and ladder rungs are dispositioned.

  19. developing-today-fleet commented on Nov 27, 2026

    @developing-today-fleet
    developing-today-fleetBot
    on Nov 27, 2026 – with developing.today fleet
    Contributor
    More actions

    Triage refresh (oc-code-01, queue task 25811, 2026-11-27): #6279 remains the Phase-14 umbrella with its charter and v1 design already delivered (PR #8243). Fresh read confirms v1 slices #10927 and #10930 remain OPEN; their follow-up tasks #24504 and #25085 are terminal, so any residual issue-level work stays with those slice records, not this umbrella. V2–v4 (#6297–#6299) and sequencing gate #1067 remain OPEN, with their existing tasks/routing intact. No new implementation packet belongs here; keep the umbrella open until its ladder and slices are dispositioned. No code changed.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    app/idPackage/app: id (pkgs/ or apps/ in this repo)design/id-phase-14Design: id-phase-14 - all issues of this effort carry iteffort/lLarge: multi-day or open-ended; expect staged check-insepic/id-platformEpic: id-platform - all issues of this effort carry itepic/id-programReprioritization program epic (2026-11-12)kind/featureNew feature or capability requestmeta/enrichedIntake review done: acceptance criteria, links, and normalized labels addedpriority/lowNice to have; do when convenientsource/humanFiled directly by a humantask/triageQueue packet kind: verify, reproduce, and route this item

    Type

    No type

    Projects

    No projects

      Milestone

      • ID Phase 14 - hosted, federated, local-firstNo due date

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions

      You are visitor 01402775 — GeezerVison does not store the pages you look up.
      Best viewed with Netscape Navigator 4.7 or Internet Explorer 6 at 800×600. No cookies required.