GeezerVison is showing github.com — id(phase-14): More shells (mobile, native, hardware) — v2 — outline: native & TUI completion · Issue #6297 · developing-today/code
id(phase-14): More shells (mobile, native, hardware) — v2 — outline: native & TUI completion #6297Todo 2 / 52 of 5 issues completedTodo 2 / 52 of 5 issues completed DescriptionMore shells (mobile, native, hardware) — v2 — outline: native & TUI completion
Part of the Phase 14 core topic #6279 (More shells (mobile, native, hardware)), filed from the next-horizons discussion #1240 per Drew's 2026-11-05 decision. The Phase 14 epic links the whole map.
Scope (rough outline — the core topic's research refines it)
Native desktop shell general-availability path (from #1072) and TUI feature completion (from #1071): shared frame layer, per-shell presentation, one conformance suite.
Entry condition
The previous step (v1 — first-iteration design) has its design written, with open questions answered or explicitly deferred to this step.
Deliverable
An updated, refined outline on this issue — tightened scope, open questions, dependencies — and the next-step issue breakdown when this step's turn approaches. If the step has dissolved into the previous one, close this issue with that note (drop rule).
Drew's Phase 14 principles (#1240) govern this step: local-first always; hostable by anyone at any scale; p2p behavior identical to hosted behavior; our hosted instance is the public backstop, never a requirement.
Acceptance criteria
- A design outline for this iteration is recorded on this issue (or in a linked design doc) covering scope, non-goals, and the key decisions this iteration must settle.
- Open questions and decision points needing Drew's ruling are listed explicitly on the issue.
- Follow-up implementation work is filed as linked issues (native sub-issues / blocked-by relations per protocol §11), not left as prose in this outline.
- The relationship to the sibling iterations of the same phase-14 topic is linked from this issue.
Sub-issuesCollapse Sub-issuesSub-issues2 of 52 of 5 Issues completedLoading 5 sub-issues Activitydeveloping-today commented on Nov 5, 2026 added app/idPackage/app: id (pkgs/ or apps/ in this repo) effort/mMedium: expected under 1 day of work meta/enrichedIntake review done: acceptance criteria, links, and normalized labels added on Nov 5, 2026dezren39 commented on Nov 5, 2026 Intake review
Fleet monitor intake (repo-fleet-monitor, 2026-11-05) — protocol §5 pass.
- Related: siblings in the same topic: id(phase-14): More shells (mobile, native, hardware) — v1 — first-iteration design #6296 (v1), id(phase-14): More shells (mobile, native, hardware) — v3 — outline: hardware shell #6298 (v3), id(phase-14): More shells (mobile, native, hardware) — v4 — outline: third-party shells #6299 (v4).
- Notes: Human-filed phase-14 design outline (More shells (mobile, native, hardware), v2 — outline: native & TUI completion). It already carries kind/feature, source/human, priority/low and an effort class; the missing piece was an acceptance-criteria section, now appended to the body. This is a design-stage item: per protocol §10/§11 nothing here is finished work until the decisions are recorded and implementation issues are filed as native relations.
- Risks: Outline issues can sit silently — the failure mode the fleet rules call out ("a design with no implementation link is flagged"). The v1→v4 ladder also risks later versions being read as commitments before earlier decisions land.
- Suggested approach: Work the ladder in order; record each iteration's decisions on its own issue; file implementation issues with native sub-issue/blocked-by links in the same pass; escalate only genuine Drew decisions, with the substance in the message.
🤖 Agent: fleet monitor · Found via: monitor intake (Duty 2)
dezren39 commented on Nov 23, 2026 🤖 Agent note · v2 outline landed — Lane CR (Muse sandbox lane, via fleet agent next as archer)
- Premise check: id(phase-14): More shells (mobile, native, hardware) — v2 — outline: native & TUI completion #6297 OPEN, no live claim (last substantive activity was the 2026-11-17 triage of record, task 19976). Entry condition verified met: v1 id(phase-14): More shells (mobile, native, hardware) — v1 — first-iteration design #6296 is CLOSED with its design record merged (PR docs(id): More shells v1 first-iteration design record (#6296, Phase 14 topic #6279) #8243,
doc/2026-11-10T20-40-00Z_design_more_shells_v1/). Siblings id(phase-14): More shells (mobile, native, hardware) — v3 — outline: hardware shell #6298 (v3) and id(phase-14): More shells (mobile, native, hardware) — v4 — outline: third-party shells #6299 (v4) remain open, so the drop rule does not apply. No v2 record existed on main.
- Landed: the refined v2 outline — PR #12816, merged as
57b47a15246d, verified on main at doc/2026-11-23T03-17-14Z_design_more_shells_v2/ (8,987 bytes). Scope: (1) native desktop GA path from id: idea — native GUI client #1072 — second target, packaging/distribution, release gate; (2) TUI feature completion from id: idea — native TUI client (ratatui) on the shell contract #1071 — capability statement first, full text-native workflow parity; (3) the mobile-native question v1 deferred to this rung, framed for a recorded decision; (4) one conformance suite extended across all shells. Non-goals name v3 hardware, v4 third-party shells, new frame kinds (F11.12 gate), and id: F12.10 fair scheduling and per-account quotas #1067 quota behaviour.
- Open questions needing Drew's ruling (explicit, per acceptance): Q1 — second native target: macOS or Windows? Q2 — mobile-native app-store shells: adopt in v2, defer to a named rung, or drop? Q3 — GA bar: all-platforms-green before any release, or per-platform independent releases? (D3 TUI subset and D4 contract-revision timing are lane/mill-settleable and are recorded as such in the outline.)
- Follow-on slices filed as linked sub-issues with blocked-by relations: id(phase-14): shells v2 slice 1 — second native target on the shared frame layer (#6297) #12817 second native target (blocked by id(phase-14): shells v1 slice 2 — first native shell (Linux desktop) on the shared frame layer (#6296) #10928), id(phase-14): shells v2 slice 2 — TUI client feature completion on the shell contract (#6297) #12818 TUI feature completion, id(phase-14): shells v2 slice 3 — native GA packaging, distribution, and release gate (#6297) #12819 native GA packaging + release gate (blocked by id(phase-14): shells v2 slice 1 — second native target on the shared frame layer (#6297) #12817, id(phase-14): shells v1 slice 2 — first native shell (Linux desktop) on the shared frame layer (#6296) #10928), id(phase-14): shells v2 slice 4 — mobile-native decision record (#6297) #12820 mobile-native decision record, id(phase-14): shells v2 slice 5 — conformance suite extension to the v2 shells (#6297) #12821 conformance suite extension (blocked by id(phase-14): shells v1 slice 5 — conformance-suite packaging for v1 shells (#6296) #10931, id(phase-14): shells v2 slice 1 — second native target on the shared frame layer (#6297) #12817, id(phase-14): shells v2 slice 2 — TUI client feature completion on the shell contract (#6297) #12818). Verified by re-read: 5 sub-issues on this issue; dependency records present.
- State of this issue: the outline deliverable is complete; id(phase-14): More shells (mobile, native, hardware) — v2 — outline: native & TUI completion #6297 stays open as the v2 container until its slices complete and Q1–Q3 are ruled. Next concrete slice: id(phase-14): shells v2 slice 2 — TUI client feature completion on the shell contract (#6297) #12818 (TUI capability statement) is unblocked now; id(phase-14): shells v2 slice 1 — second native target on the shared frame layer (#6297) #12817 waits on id(phase-14): shells v1 slice 2 — first native shell (Linux desktop) on the shared frame layer (#6296) #10928 and Q1.
dezren39 commented on Nov 23, 2026 Owner rulings on the v2 open questions (Drew, 2026-11-22, main chat):
Recorded by Archer from Drew's answers in the main chat, 2026-11-22 ~21:25 CST. developing-today-fleet commented on Nov 25, 2026 agent-note:v1 — graph hygiene audit #14863 slice 7 (felix lane, 2026-11-25)
Contradictory labels (comment-only correction): this issue carries status:in-review (colon style) together with status/triaged. Flagged for the holder to drop one; labels left unchanged by this audit. (Graph state this slice: #6297 is the current frontier of the More-shells ladder — its own gate #6296 is CLOSED, and #6298 is now natively blocked by #6297.) Refs #14863 developing-today-fleet commented on Nov 26, 2026 🤖 Agent note · triaged — v2 outline delivered; implementation container remains live
Fresh verification (2026-11-26):
Disposition: #6297 is real/current and remains OPEN as the v2 container until its linked slices finish. No duplicate follow-up packet is needed; the work is already represented by its linked child issues. Corrected stale lifecycle labels: removed status/triaged and queue/queued, added queue/claimed; status:in-review remains appropriate while the container’s slices are being delivered.
Evidence: #6297 issue body and comments; #12816; #15322; #13070; child issues #12817–#12821. developing-today-fleet commented on Nov 26, 2026 Triage task 24351 is now complete. The temporary queue/claimed label was removed because no direct queue task remains on #6297; its linked child issues/tasks continue independently. The issue remains status:in-review as the open container for those slices. developing-today-fleet commented on Nov 27, 2026 🤖 Agent note · triaged (safety-net requeue — still live container, no new action)
- Agent: repo-worker-code, lane code-i (task 24541, monitor safety-net requeue 2026-11-26)
- Fresh verification (2026-11-27): id(phase-14): More shells (mobile, native, hardware) — v2 — outline: native & TUI completion #6297 OPEN (
status:in-review container). Entry condition holds: v1 id(phase-14): More shells (mobile, native, hardware) — v1 — first-iteration design #6296 CLOSED with design PR docs(id): More shells v1 first-iteration design record (#6296, Phase 14 topic #6279) #8243 merged.
- Outline delivered: v2 decision record PR design(id): more shells v2 outline — native & TUI completion (#6297) #12816 MERGED 2026-11-23.
- Remainder lives in the child ladder: id(phase-14): shells v2 slice 2 — TUI client feature completion on the shell contract (#6297) #12818 OPEN (in progress — TUI completion), id(phase-14): shells v2 slice 3 — native GA packaging, distribution, and release gate (#6297) #12819 OPEN, id(phase-14): shells v2 slice 5 — conformance suite extension to the v2 shells (#6297) #12821 OPEN; id(phase-14): shells v2 slice 1 — second native target on the shared frame layer (#6297) #12817 and id(phase-14): shells v2 slice 4 — mobile-native decision record (#6297) #12820 CLOSED. v3 sibling id(phase-14): More shells (mobile, native, hardware) — v3 — outline: hardware shell #6298 OPEN, natively blocked by this container.
- Verdict: follow_on. No change to the issue; the live successor owning the current remainder is id(phase-14): shells v2 slice 2 — TUI client feature completion on the shell contract (#6297) #12818. This requeue (dedupe_override monitor-requeue-2026-11-26) duplicates the 2026-11-26 triage (task 24351) — no new routing needed.
MetadataMetadataDevelopmentNo branches or pull requestsIssue actions
|