GV

GeezerVison

The World Wide Web, restored to 800 pixels of glory.

Home|About|Gaming cabinet|Archives|How it works|Starter sites

On this site

  • Sign in
  • ActionsCI/CD and automation
  • CodespacesCloud development environments
  • All Features
  • Documentation
  • Training
  • Certifications
  • Build with Copilot
  • Customize Copilot
  • Integrations
  • Trending repos
  • GitHub Sponsors
  • Developer articles
  • Enterprises

This view

  • Original page
  • New address

GeezerVison is showing github.com — dashboard: full id platform coverage — auto-updated phases, validation, CI and queue panels · Issue #1239 · developing-today/code

dashboard: full id platform coverage — auto-updated phases, validation, CI and queue panels #1239

New issue
Copy link
New issue
Copy link
Closed
Closed
dashboard: full id platform coverage — auto-updated phases, validation, CI and queue panels#1239
Copy link
Assignees
dezren39
Labels
app/idPackage/app: id (pkgs/ or apps/ in this repo)app/pm-stackpm-stack (Pad/Grist) in developing-today/codeeffort/lLarge: multi-day or open-ended; expect staged check-insepic/id-programReprioritization program epic (2026-11-12)kind/featureNew feature or capability requestmeta/enrichedIntake review done: acceptance criteria, links, and normalized labels addedmeta/follow-upFollow-up spun out of earlier workmode/onlineFully doable remotely: design, config, code, cloudnextOrg Project gate: queued next — orchestrator adds to the boardpriority/normalOrdinary priority (the default)source/humanFiled directly by a humanstatus:donetask/triageQueue packet kind: verify, reproduce, and route this item

Description

@dezren39
dezren39
opened on Oct 27, 2026
Issue body actions

dashboard: full id platform coverage — auto-updated, nothing hand-maintained

The PM dashboard now lists id (Grist roadmap rows + org Project), but the id picture is still assembled by hand and goes stale. Build the id section out into a coherent, full-featured, automatically updated view of the whole platform. Drew (2026-10-26): "We need to make a coherent, full-featured dashboard that covers everything and gets updated automatically with all aspects of the id platform built out on it."

Panels (all fed from live sources, no manual edits)

  • Path to Phase 12: the ordered checklist from id: Path to Phase 12 — ordered prerequisite queue (CI trust → validation → journal → visibility → remaining F11) #1235 with live per-step state (issue state + queue state), so the "what's next" answer is always on screen.
  • Phase tracker: Phases 0–13 progress derived from the phase plans + issue states (F-item mapping), including validation status per phase from id: validation — Phases 0–8 + platform completion acceptance audit #1075–id: validation — delivered Phase 11 items (claimed-done audit) #1078 and their follow-ups.
  • Build health: PR CI lane + id E2E nightly trend (pass/fail history, current failure links) from the GitHub Actions API.
  • Queue & fleet: repo-health queue depth/age for id work, claimed/parked items, sweep outcomes — the same numbers the fleet runs on.
  • Phase 12 readiness: per-F-item state (design via id: Phase 12 designs to run through the research workflow #534, issue, PR) for F12.1–F12.18.

Rules

  • Strategy rows stay human-owned in Grist; everything operational is generated. If a number on the dashboard required a person to type it, that's a bug in this issue's terms.
  • Reuse the existing aggregator + collectors (Projects-token collector pattern); extend the Grist seed/roadmap generation from planning/roadmaps/id.md where a table is wanted.
  • Mobile-reviewable, per the slice-2 dashboard rules (impl(aggregator): slice 2 — mobile, needs-Drew/needs-orchestrator tiers, time-granular roadmap, session clarity #898). Loopback + tailnet only, same access model as today.
  • Coordinate scope with the discussion in the "next horizons" issue before building panels beyond the list above.

Acceptance: the five panels live on the dashboard, each showing a source timestamp; killing any manual step in keeping them current; a stale-source warning appears instead of silently old data.

Acceptance criteria

  • The dashboard's id section shows all five panels — Path to Phase 12 (id: Path to Phase 12 — ordered prerequisite queue (CI trust → validation → journal → visibility → remaining F11) #1235 steps with live issue + queue state), Phase tracker (Phases 0–13 incl. validation status from id: validation — Phases 0–8 + platform completion acceptance audit #1075–id: validation — delivered Phase 11 items (claimed-done audit) #1078), Build health (PR CI lane + E2E nightly trend from the GitHub Actions API), Queue & fleet (repo-health depth/age, claimed/parked, sweep outcomes), Phase 12 readiness (per-F-item design/issue/PR state for F12.1–F12.18).
  • Every operational number on the dashboard is generated from a live source; if a number required a person to type it, that is a defect against this issue. Strategy rows remain human-owned in Grist.
  • The dashboard is mobile-reviewable and keeps the existing access model (loopback + tailnet only), reusing the aggregator + collectors (Projects-token collector pattern).

Activity

Next
  1. dezren39
    added
    kind/featureNew feature or capability request
    status/needs-triageNot yet triaged; needs a first look
    source/humanFiled directly by a human
    app/idPackage/app: id (pkgs/ or apps/ in this repo)
    nextOrg Project gate: queued next — orchestrator adds to the board
    effort/lLarge: multi-day or open-ended; expect staged check-ins
    app/pm-stackpm-stack (Pad/Grist) in developing-today/code
    on Oct 27, 2026
  2. developing-today commented on Oct 27, 2026

    @developing-today
    developing-todayBot
    on Oct 27, 2026 – with developing.today
    Contributor
    More actions

    CODE-368

  3. github-actions
    assigned
    dezren39
    on Oct 27, 2026
  4. dezren39
    added
    meta/enrichedIntake review done: acceptance criteria, links, and normalized labels added
    priority/normalOrdinary priority (the default)
    on Oct 27, 2026
  5. dezren39 commented on Oct 27, 2026

    @dezren39
    dezren39
    on Oct 27, 2026
    MemberAuthor
    More actions

    Intake review

    Related: #1235 (Path to Phase 12 — source of the ordered-step panel), #898 (slice-2 dashboard rules), #1240 (next-horizons discussion — coordinate scope there before building panels for undecided phases).

    Notes: The filer already normalized kind/source/status/effort/app labels; this pass added priority and acceptance criteria. The 'no hand-typed numbers' rule in the body is the sharpest requirement and is now an explicit acceptance test.

    Risks: Panel scope can sprawl — five panels each with a live collector is a real build; the Phase 12 readiness panel depends on #534's design pass producing per-F-item state worth showing. Staleness must be visible (a dead collector should look dead, not quietly freeze at its last value).

    Suggested approach: Build panel by panel behind the existing aggregator, starting with Path to Phase 12 (its data model — issue + queue state — is already the fleet's daily bread).

  6. dezren39
    added
    work/assignedQueue worker lifecycle state
    queue/claimedQueue worker lifecycle state
    and removed
    status/needs-triageNot yet triaged; needs a first look
    on Nov 1, 2026
  7. 36 remaining items

  8. dezren39 commented on Nov 14, 2026

    @dezren39
    dezren39
    on Nov 14, 2026
    MemberAuthor
    More actions

    Released to the queue under Drew's 2026-11-13 unblock-all order (main chat, 23:53 CT). Task(s) 15180 moved from blocked/parked to queued in the fleet unblock-all pass (worker main-unblock-all-2026-11-13). Dependency gates still recorded on a task remain recorded — the dependency checker will re-block it if a gate is genuinely unmet.

  9. dezren39
    added
    work/assignedQueue worker lifecycle state
    queue/claimedQueue worker lifecycle state
    status/in-progressQueue worker lifecycle state
    and removed
    queue/queuedHas a queued queue task
    on Nov 14, 2026
  10. dezren39 commented on Nov 14, 2026

    @dezren39
    dezren39
    on Nov 14, 2026
    MemberAuthor
    More actions

    🤖 Agent note · picked up

    • Agent: repo queue worker, lane any-c (repo-worker-code)
    • Session / ID: cron repo-queue-worker-shift-any-c run 2026-11-14; task 15180
    • Found via: claimed task 15180 this shift (unfiltered one-queue claim); execution-lane assignment returned direct (lane row 7840) — this lane triages it itself.
    • Task: task 15180 for issue dashboard: full id platform coverage — auto-updated phases, validation, CI and queue panels #1239 (triage): fresh triage of the id-platform dashboard build-out and production of a coherent follow-on packet. Fresh check: issue dashboard: full id platform coverage — auto-updated phases, validation, CI and queue panels #1239 is OPEN, no hard-stop labels. Prior attempt task 8045 (small_fix, P1 panel only) was blocked as packet_defect on 2026-11-04 and is now cancelled: its finding was that the aggregator had no queue read source and no read-only queue list API / issue-to-task mapping existed. The queue has since moved to the Turso backend with broker /list and /coverage surfaces (code#6741, code#7016), so that premise is re-checked fresh at current main before any split is proposed.
    • Expectation: triage note on issue dashboard: full id platform coverage — auto-updated phases, validation, CI and queue panels #1239 with the current-state panel inventory, the decided split, and follow-on task(s) enqueued (dedupe-checked); task 15180 completed as triaged.
    • Links: task 15180 · issue dashboard: full id platform coverage — auto-updated phases, validation, CI and queue panels #1239 · issue id: Path to Phase 12 — ordered prerequisite queue (CI trust → validation → journal → visibility → remaining F11) #1235
  11. dezren39 commented on Nov 14, 2026

    @dezren39
    dezren39
    on Nov 14, 2026
    MemberAuthor
    More actions

    🤖 Agent note · triaged

    • Agent: repo queue worker, lane any-c (repo-worker-code)
    • Session / ID: cron repo-queue-worker-shift-any-c run 2026-11-14; task 15180
    • Task: task 15180 for issue dashboard: full id platform coverage — auto-updated phases, validation, CI and queue panels #1239 (triage) — triaged fresh from current state, per the re-packet brief (prior task 8045 was blocked packet_defect and is cancelled).

    Current state (verified fresh 2026-11-14, main d997fb4):

    • None of the five panels exists in pm-stack/aggregator: no panel titles, no phase/CI/readiness derivations. The "Path to Phase 12" content is still the hand-written prose in project-config.ts (~lines 303–309) that task 8045 flagged. The existing queue-view.ts is a board/Project projection, not a fleet-queue feed.
    • Task 8045's blocking premise is retired: it required a safe read-only queue API that did not exist on 2026-11-04. The queue now runs on the Turso backend behind the queue-broker (code#6741) with read surfaces the coverage reconciliation already uses (code#7016): /health, /list (rich rows), /coverage — laptop-local, token-file auth, no dispatch service-role credential needed.
    • All source matter is settled: id: Path to Phase 12 — ordered prerequisite queue (CI trust → validation → journal → visibility → remaining F11) #1235 (ordered steps), id: validation — Phases 0–8 + platform completion acceptance audit #1075–id: validation — delivered Phase 11 items (claimed-done audit) #1078 (validation), id: Phase 12 designs to run through the research workflow #534 (Phase 12 designs), impl(aggregator): slice 2 — mobile, needs-Drew/needs-orchestrator tiers, time-granular roadmap, session clarity #898 (dashboard rules) are all CLOSED. This is a build-out, not a research problem.

    Triage decision: work kind = feature build split into small_fix slices (the issue's own kind/feature + effort/l stand; priority/normal stands — PM-stack hub work, Drew priorities brief line 4). One foundation slice + one slice per panel, each with its own issue and queue task so no packet can go incoherent the way task 8045's did:

    Slice Issue Queue task
    Read-only fleet-queue collector (foundation; retires the 8045 defect) #9920 task 16679
    Phase tracker panel #9923 task 16681
    Build health panel #9924 task 16682
    Phase 12 readiness panel #9926 task 16683
    Queue & fleet panel (gated on task 16679) #9921 task 16685
    Path to Phase 12 panel (queue join gated on task 16679) #9922 task 16686

    The two gated packets name task 16679 in their evidence and instruct the claiming lane to dep-block on it (§5b) if the collector has not landed — the dependency is recorded in the packets, not left as tribal knowledge. First concrete step for the set: task 16679 (collector). Acceptance for the set: #1239's own criteria, per-panel as written on each split issue.

    Task 15180 completes as triaged with these follow-ons; issue #1239 stays open as the parent tracker until the panel tasks land.

  12. dezren39
    removed
    status/in-progressQueue worker lifecycle state
    queue/claimedQueue worker lifecycle state
    work/assignedQueue worker lifecycle state
    on Nov 14, 2026
  13. dezren39 commented on Nov 14, 2026

    @dezren39
    dezren39
    on Nov 14, 2026
    MemberAuthor
    More actions

    Agent note — task 16691 re-triage: split already routed by task 15180 (lane any-b)

    • state: triaged
    • task: 16691
    • issue: dashboard: full id platform coverage — auto-updated phases, validation, CI and queue panels #1239
    • Fresh check (2026-11-14): task 15180 (lane any-c, 11:27Z today) already triaged dashboard: full id platform coverage — auto-updated phases, validation, CI and queue panels #1239 and executed the split this re-packet asked for — the 8045 packet_defect premise is retired by the queue-broker's read surfaces, and the build-out is routed as six small_fix slices, each with its own issue and queue task: collector foundation aggregator: read-only fleet-queue collector (broker /list + /health) with source timestamps and stale warning (#1239 split) #9920 → task 16679 (gates the two queue-fed panels), Phase tracker dashboard: Phase tracker panel (Phases 0–13 + validation #1075–#1078) for the id section (#1239 split) #9923 → task 16681, Build health dashboard: Build health panel (PR CI lane + id E2E nightly trend) for the id section (#1239 split) #9924 → task 16682, Phase 12 readiness dashboard: Phase 12 readiness panel (F12.1–F12.18 design/issue/PR state) for the id section (#1239 split) #9926 → task 16683, Queue & fleet panel dashboard: Queue & fleet panel for the id section, fed by the fleet-queue collector (#1239 split) #9921 → task 16685, Path to Phase 12 dashboard: Path to Phase 12 panel — live #1235 step state replacing the project-config.ts narrative (#1239 split) #9922 → task 16686. This lane concurs in full; a second packet set from task 16691 would duplicate live tasks.
    • Route: task 16691 completes as triaged naming task 15180's follow-ons. dashboard: full id platform coverage — auto-updated phases, validation, CI and queue panels #1239 stays open as the parent tracker until the panel tasks land; its queue/queued label comes off since no task for dashboard: full id platform coverage — auto-updated phases, validation, CI and queue panels #1239 itself remains — the slices carry their own.
  14. dezren39 commented on Nov 17, 2026

    @dezren39
    dezren39
    on Nov 17, 2026
    MemberAuthor
    More actions

    agent-note:v1 — task 18095 (triage, lane code-d) — state: done (already_done)

    Triage verdict for issue #1239: ALREADY DONE — the build-out was split and landed on 2026-11-14, and this parent tracker simply never got closed. Closing it now with the evidence.

    Fresh evidence this shift (2026-11-17T01:31Z, all via gh / laptop checkout):

    • Issue dashboard: full id platform coverage — auto-updated phases, validation, CI and queue panels #1239 OPEN at claim; labels kind/feature, task/triage, priority/normal, effort/l, meta/enriched, epic/id-program; no held / user/owned / do-not-merge / do-not-auto-edit labels and no status/needs-triage.
    • The task 15180 triage (2026-11-14) split this issue into six small_fix slices, each with its own issue; every slice issue is now CLOSED: foundation collector aggregator: read-only fleet-queue collector (broker /list + /health) with source timestamps and stale warning (#1239 split) #9920 (status:done), Queue & fleet panel dashboard: Queue & fleet panel for the id section, fed by the fleet-queue collector (#1239 split) #9921 (status:done), Path to Phase 12 panel dashboard: Path to Phase 12 panel — live #1235 step state replacing the project-config.ts narrative (#1239 split) #9922 (closed as done — PR aggregator: join queue state into the Path to Phase 12 panel (#9922) #10117 merged 2026-11-14T16:15:19Z, with per-step live issue + queue state, source line naming the collector and fetch time, and a stale-queue warning instead of silently old data; 41 targeted tests pass), Phase tracker dashboard: Phase tracker panel (Phases 0–13 + validation #1075–#1078) for the id section (#1239 split) #9923 (status:done), Build health dashboard: Build health panel (PR CI lane + id E2E nightly trend) for the id section (#1239 split) #9924 (status:done), Phase 12 readiness dashboard: Phase 12 readiness panel (F12.1–F12.18 design/issue/PR state) for the id section (#1239 split) #9926 (status:done).
    • The panel code is on main in pm-stack/aggregator/src: phase-tracker.ts (dashboard: Phase tracker panel (Phases 0–13 + validation #1075–#1078) for the id section (#1239 split) #9923), build-health.ts (dashboard: Build health panel (PR CI lane + id E2E nightly trend) for the id section (#1239 split) #9924), f12-readiness.ts (dashboard: Phase 12 readiness panel (F12.1–F12.18 design/issue/PR state) for the id section (#1239 split) #9926), phase12.ts (dashboard: Path to Phase 12 panel — live #1235 step state replacing the project-config.ts narrative (#1239 split) #9922), plus the aggregator: read-only fleet-queue collector (broker /list + /health) with source timestamps and stale warning (#1239 split) #9920 fleet-queue collector wiring in config.ts — all generated from live sources, reusing the aggregator + collectors as the issue's rules require.
    • That meets this issue's acceptance: the five panels live on the dashboard, operational numbers generated (strategy rows stay human-owned in Grist), source timestamps shown, and stale-source warnings instead of silently old data (explicitly verified in the dashboard: Path to Phase 12 panel — live #1235 step state replacing the project-config.ts narrative (#1239 split) #9922 slice).

    Task 18095 completes as already_done. No follow-on packet: nothing remains.

  15. dezren39
    closed this as completedon Nov 17, 2026
  16. developing-today
    added
    status:done
    on Nov 17, 2026
  17. dezren39 commented on Nov 17, 2026

    @dezren39
    dezren39
    on Nov 17, 2026
    MemberAuthor
    More actions

    🤖 Agent note — task 19449 triage: already resolved

    Freshly verified 2026-11-17: issue #1239 is CLOSED (status:done). Its prior triage (task 18095, comment #1239 (comment)) verified that all six split slices (#9920, #9921, #9922, #9923, #9924, #9926) are closed, with the dashboard panels on main and the parent acceptance criteria satisfied. No follow-on packet is needed; this repeated intake task is complete as already resolved.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

  • @dezren39
    dezren39

Labels

app/idPackage/app: id (pkgs/ or apps/ in this repo)app/pm-stackpm-stack (Pad/Grist) in developing-today/codeeffort/lLarge: multi-day or open-ended; expect staged check-insepic/id-programReprioritization program epic (2026-11-12)kind/featureNew feature or capability requestmeta/enrichedIntake review done: acceptance criteria, links, and normalized labels addedmeta/follow-upFollow-up spun out of earlier workmode/onlineFully doable remotely: design, config, code, cloudnextOrg Project gate: queued next — orchestrator adds to the boardpriority/normalOrdinary priority (the default)source/humanFiled directly by a humanstatus:donetask/triageQueue packet kind: verify, reproduce, and route this item

Type

No type

Projects

No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions

    You are visitor 01402775 — GeezerVison does not store the pages you look up.
    Best viewed with Netscape Navigator 4.7 or Internet Explorer 6 at 800×600. No cookies required.