GeezerVison is showing github.com — ID program — full investigation, design completion & build-out (program tracking) · Issue #13240 · developing-today/code
ID program — full investigation, design completion & build-out (program tracking) #13240DescriptionID program — full investigation, design completion & build-out (program tracking)
Drew's directive (2026-11-23): run a program-scale investigation of the full ID project —
purpose, current and planned capabilities, short- and long-term roadmap, key designs (completed,
in progress, planned), dependency and blocker map — and use it to review and organize all
designs, improve every design, and create new designs for the obvious next steps: v1 ideas
taken to a fully featured platform, not an MVP.
Ground truth (verified 2026-11-23)
- Epics: epic: ID platform expansion — apps, comms, currency, hosting, boards (2026-10-28 directive, LIST 6–15) #2056 (27/29 closed; open id: design: ID messaging/relay protocol v1 #2036 messaging/relay, id: design: match attestation + audit v1 #2039 match attestation) and epic: ID/Atlas extensible primitives, federation, namespaces — major design iteration (2026-11-12 directive) #9106
(Parts A/B/C). No single charter doc exists — designs live in the repo-root doc/ archive.
- 16 crates under
pkgs/id/crates/; root id is the only public surface.
- Shipped: Iroh P2P file CLI + REPL + web UI,
id walk skeleton, hosted Cloudflare Worker, MCP
bridge + mcp_policy::PolicySession (id(phase-14): spike 4/5 — policy point: capability ceiling, session quota, audit log #7916 closed, id(phase-14): spike 5/5 — bounded program interaction + end-to-end spike run #7917 open), Roc guest apps
(tic-tac-toe + 13 examples), Bevy native shell step 2a (id: rich presentation surfaces — versioned scene/audio/widget contract extension + Bevy renderers (F13.6 follow-on) #12657).
- Scale (id(phase-14): Scale & performance hardening — v1 — first-iteration design #6304): frame cost FLAT ≈958,616 fuel at 10k/100k/1M (id(phase-14): frame cost vs world state size — view fuel and wall time at 10k/100k/1M events #13085); memory ≈18–22 KB/world
(id(phase-14): memory profile at scale — RSS per resident world and compaction spike #13086 closed). Codified 256-participant cap vs 320/3,200 tier targets (id(phase-14): stress generator — seeded tier worlds for the v1 stress program #13083).
- Census: 208 open
app/id, 191 epic/id-program, 36 epic/id-platform; 44 blocked, 41 design.
Research threads (Drew's list)
Falcor/BLAS; app platforms; new interfaces and I/O equivalencies across platforms; Roc (incl.
Luke Boswell's roc-ray / roc-tui / roc-gui / roc-native-android work); Rust + Roc libraries for
the id binary and id-as-a-library; a standard capability set tied to Roc libraries; pure vs
impure app definitions; a generic token trading/market system with tokens tied to app fuel and
in-app items; sprites and basic text/2D games (Dwarf Fortress, Space Invaders, Dig Dug), basic
simulations, sketching, mind mapping; visualizing/searching the ID object graph; embeddings for
search (the Atlas project baked in); Bevy platform support + ECS; cleaner server/client
capability separation; full OCapN + CRDT support; major components distinguished (pure rendering
clients, content-addressed storage, signing, iroh-native approach); text/property objects as
structured data; binary formats (images/video); MCP and using each part as a library in other
apps; one distributed federated graph where servers and clients are technically the same with
different platforms/capabilities.
Deliverables
- A comprehensive document series in book form (bookwright method), published on the
existing code-repo Pages site under /code/id/, with a DOC-01-style docs-sync contract.
- An issue-by-issue map of ALL id issues, prioritized in best working order, with all
blockers marked on the issues and in the list.
- Many designs — existing ones reviewed/improved, new ones for the obvious next steps — landed
by PR in the doc/ archive.
- Many PRs merged — implementation slices wherever unblocked, in dependency order.
- Core architecture diagrams (mermaid/SVG/graphviz) and mockups of the current system and
next steps.
Operating rule
The prompt (posted as the first comment on this issue, and added to the repo by the starter PR)
is a starting point, not a stopping point: expand until everything possible is done, review,
repeat. Many parallel agents across analyze/research/design/document/implement workstreams.
Related: #2056, #9106, #6304, #6062, #9109.
{
"direct_parent": null,
"links": [],
"lineage": {
"design": null,
"roadmap_item": null,
"priority": null
},
"pm_meta": 1,
"provenance": {
"queue_id": null,
"scheduled_start": null,
"picked_up_at": null,
"work_started_at": null,
"created_at": "2026-11-23T12:04:42Z",
"session_id": null,
"lane": null,
"host": "htch-runtime",
"worktree": null,
"model": null,
"lane_start_issues": [],
"workspace_ref": null,
"auth_subject": "archer",
"stamped_by": "fleet 0.1.0 (native)"
}
}
Activitydeveloping-today commented on Nov 23, 2026 dezren39 commented on Nov 23, 2026 ID Program — Full Investigation, Design Completion & Build-Out Prompt
You are the coordinator of a program-scale investigation and build-out of the ID project in
developing-today/code (pkgs/id). This prompt is a starting point, not a conclusive or final
stopping point. Work the design end to end, begin implementation wherever you are unblocked, and
when a pass finishes, review what remains, expand the plan, and repeat — until nothing more can be
done with the access and authority you have. Use subtasks and orchestration heavily: launch many
parallel agents (analyze, research, design, document, implement) and keep them pointed at the
frontier. A phase finishing is a signal to start the next one, not to stop and ask.
1. What ID is (ground truth — verify, don't re-derive)
ID is a local-first, federated, capability-based application platform: content-addressed objects in
a signed event graph, apps defined against a standard capability set, and nodes that are
simultaneously clients and servers with different platform/capability profiles. Governing
principles (from #6304 / #1240 / #6312): local-first; hostable by anyone; peer-to-peer ≡ hosted;
a hosted instance is a backstop, never a requirement.
- Program epics: #2056 (core build, first
apps, comms, currency, hosting, notes, chat, boards — 27/29 sub-issues closed; open:
#2036 messaging/relay protocol v1,
#2039 match attestation/audit) and
#9106 (extensible primitives, federation,
namespaces — Part A core, Part B federation/trust, Part C Atlas-facing).
- There is no single charter doc. Design docs live in the repo-root
doc/ archive (~2,900
timestamped paths; pkgs/id/doc and pkgs/id/docs symlink there) plus pkgs/id/README.md,
pkgs/id/ARCHITECTURE.md, pkgs/id/WEB.md. Producing the charter is part of your job (§5).
- Code: 16 crates under
pkgs/id/crates/; the root id crate is the only public surface,
id-core the shared core. id-currency-registry and id-render are flagged no-dependents in
ARCHITECTURE.md — resolve or retire that flag as part of the architecture review.
- Shipped today: Iroh P2P file CLI + REPL + collaborative web UI;
id walk federation-walking
skeleton; a hosted Cloudflare Worker (per-user Durable Object, bridge store/auth, currency,
export/import — both halves landed 2026-11-23); an MCP bridge with the reconciled
mcp_policy::PolicySession in id-caps (id(phase-14): spike 4/5 — policy point: capability ceiling, session quota, audit log #7916 closed; id(phase-14): spike 5/5 — bounded program interaction + end-to-end spike run #7917 open); invites with the depth-cap
fix (id(invites): sign_terms accepts child depth above the delegation cap #13217); BoundaryGate at signup/login; Roc guest apps as a shipped pattern
(tic-tac-toe + 13 examples); a Bevy native shell (step 2a of id: rich presentation surfaces — versioned scene/audio/widget contract extension + Bevy renderers (F13.6 follow-on) #12657 landed).
- Scale program id(phase-14): Scale & performance hardening — v1 — first-iteration design #6304, measured: frame cost is FLAT at ≈958,616 fuel across 10k/100k/1M
events (id(phase-14): frame cost vs world state size — view fuel and wall time at 10k/100k/1M events #13085); resident memory ≈18–22 KB per world blended at 1x/10x, compaction spike
89 MiB at 100k entries, no wall (id(phase-14): memory profile at scale — RSS per resident world and compaction spike #13086). Open tension: the codified 256-participant cap vs
the 320 / 3,200 tier targets (id(phase-14): stress generator — seeded tier worlds for the v1 stress program #13083). id(phase-14): join-time benches — cold and warm join at stress tiers #13084 (join-time benches) is flag-held; id(phase-14): first 10x stress run — measured limits table update #13087/id(phase-14): 100x feasibility run — find and record the wall #13088
are blocked behind the scale chain.
- Backlog census (2026-11-23, Search API): 208 open
app/id, 191 epic/id-program,
36 epic/id-platform; of app/id: 44 status/blocked, 28 status/in-review,
19 queue/queued, 41 kind/design. The design backlog is the centre of gravity: Phase-14 core
topics id(phase-14): Hosted worlds & always-on hosting — core topic (research + design) #6276–id(phase-14): Creator tooling & insight — core topic (research + design) #6282 + outlines, the id: design program: worlds — advanced Roc libraries, capabilities, permissions, dynamic user functions, licensing (2026-11-04 brief) #5955 worlds program (Roc libraries, dynamic user functions,
presentation assets), the #567x cluster (wire format, currency scaling, knowledge layer, Bevy
incorporation id: design: Bevy incorporation — ID worlds as Bevy applications (ECS mapping of the entity/triple model) #5781, ESP32 id: design: ESP32 hardware platform line — boards, provisioning, firmware lifecycle, OTA, power #5783), federation/trust designs design(id): versioning — succeeds triples + carried-forward comments #9129–research(id): takeover resistance + acknowledgment-based inconsistency detection #9148.
- Blocker chains (heads first): scale chain (§above); store conformance design(id): store abstraction — Turso/SQLite-over-HTTP beside redb, IndexedDB evaluated (one interface, pluggable backends) #9082/design(id): extensibility architecture — primitive/adapter/hook boundary spec + backend conformance #9110 (slices
Build shared store conformance fixtures and capability reports #10191 + Prototype IndexedDB adapter for bounded conformance evaluation #10213 closed — the only remaining step is design(id): store abstraction — Turso/SQLite-over-HTTP beside redb, IndexedDB evaluated (one interface, pluggable backends) #9082's adopt/defer/reject call on the
fixture's reserved IndexedDB entry); [Architecture] Decouple Web UI from Core Library #6377 → [Innovation] AI-Powered File Management Integration #6381; Append submission, mandatory pending gate and atomic approval #10237 → Nested topic/comment objects and bounded feed projections #10252 → Default ancestor-comment carry with origin marker #10269 (implementation
landed for Append submission, mandatory pending gate and atomic approval #10237; its close is flag-held); hosted worlds id(phase-14): hosted worlds v1 P1 — host mode in the id binary (supervisor + data root) #10693 → id(phase-14): hosted worlds v1 P5 — basement-cluster deployment pack #10697 (all blocked);
discovery id(phase-14): publish-to-pkarr for world announcements (#6287 breakdown 2/5) #10706/id(phase-14): discovery resolver — invite link, pkarr, registries in order (#6287 breakdown 4/5) #10708/id(phase-14): Discovery, registry & federation — v2 — design: the public registry endpoint #10712 (blocked); jurisdiction id: add immutable jurisdiction and migration metadata to hosted directory #3399 → id: enforce restricted jurisdiction routing and object entry guards #3400–id: implement fenced jurisdiction migration control plane #3404 → id: implement Jurisdiction-partitioned hosted worlds and world blobs (design #3397) #5528/id: partition-local world blobs — per-jurisdiction R2 binding, world-reference indexing, local dedup + safe GC (design #3397 Phase 3, #5528 split) #9935;
Atlas D1 chain impl(atlas): D1 hot-cache schema, binding, and store module for the atlas-search Worker #13100 → impl(atlas): D1 hot-cache freshness evaluator — per-class watermark/TTL rules #13101 → impl(atlas): D1 hot-cache read-path integration — Turso-hop skip with skip logging #13105 → impl(atlas): D1 hot-cache measurement report for the storage-economics prototype #13107 (impl(atlas): D1 hot-cache invalidation — tenant events, Worker consumption, operator purge #13106 flag-held). Corrections to common
assumptions: design(pm-stack): content-addressed media/data plane — R2 dedup, reference-based access, GC when the last reference drops #9084 is a pm-stack issue, not an ID chain head; the PM-orchestration DAG
(design(pm-orchestration): requirement crosswalk & current-state census #9198–design(pm-orchestration): Idempotency identity and stable structured receipts #9513) does not touch ID except operationally (task 16081 / design(pm-orchestration): Versioned desired/observed snapshot reconciler with dirty cursor + full audit. Owns proposed pm-stack/projector/src/priority-reconcile.ts, test/priority-reconcile.test.ts #9455 dep-blocked on design(pm-orchestration): priority distribution, provenance & reconciliation across producers/consumers #9200).
- Platform priority (Drew, 2026-11-22): Linux → Android → Web → macOS → Windows; mobile
native adopted, high priority; per-platform releases with granular tags.
- Atlas relationship (stated): #6062
(ID-graph publication format design, open) + unstarted projectors impl(atlas/id): projector — versions, files, relations emission (#6062 follow-on 1) #11182–impl(atlas/id): ID-graph publication conformance audit (#6062 follow-on 5) #11186 + epic: ID/Atlas extensible primitives, federation, namespaces — major design iteration (2026-11-12 directive) #9106 Part C
#9109 (storage economics, ID search,
recommendations). "Atlas baked into ID" is this program's direction to design, not a
recorded decision — design it, don't assume it.
2. Research seeds (Drew's threads — start here, go further)
- Falcor / BLAS further development — Falcor's virtual JSON Graph, path addressing
(get/set/call), normalized cache. The library is dormant (v2.x, years without releases):
steal the model for native graph navigation, add typed querying as a view layer, do not adopt
the library. BLAS-class numerics belong host-side: faer (decompositions), nalgebra
(game/geometry), ndarray (interchange), fastembed-rs/lancedb for embeddings — exposed to apps
as capabilities, never linked into pure app definitions.
- App platforms; new interfaces and I/O equivalencies across platforms — define what an "app"
is on each tier (CLI, TUI, GUI, web, Android, embedded/ESP32) and the equivalency rules that let
one app definition render/interact on all of them.
- Roc — the platform model is an unusually exact fit: the platform supplies all I/O, so a
platform literally is a capability set. Define the Roc-side API once; implement hosts per
target; the same pure app runs everywhere; purity is syntactic (effectful hosted functions carry
! in the new compiler); hosts can meter/refuse each hosted call — a natural fuel hook.
Read all of Luke Boswell's work:
- https://www.reddit.com/r/roc_lang/s/3nfBm2CheC (could not be fetched in pre-research — read it
first-hand if reachable; it most plausibly announces roc-native-android)
- https://lukewilliamboswell.github.io/roc-ray-experiment/ and
https://lukewilliamboswell.github.io/roc-native-android/ and the whole blog
https://lukewilliamboswell.github.io/ (multi-entrypoint hosts + roc PR id: implement signed transport advertisements + rendezvous fetch/verify client (from #5793 decision record) #8214; Action-State GUI
with zig + raylib; roc-pga2d physics; basic-cli TUI text editor; fullstack Roc + htmx ×3)
- roc-ray (release 0.12.1, featured on roc-lang.org examples; init!/update!/render! model),
roc-tui, roc-gui, roc-signals (reactive engine; the thing ported to Android),
roc-native-android (Zig JNI bridge + Kotlin host, APK scaffolding; author-stated gaps,
emulator-only — but a real existence proof for the Android tier), roc-awesome,
Hasnep's roc-packages index.
- Caveats to design around: Roc is pre-1.0, compiler rewritten in Zig, two dialects in the
wild, most platforms single-maintainer experiments. ID's Roc layer must be insulated from
compiler churn (pin, abstract, or vendor the boundary).
- Rust + Roc libraries to improve the id binary and id-as-a-library — audit every crate
boundary: what should be a reusable library (storage, caps, graph, wire, fuel, render) vs
binary-only. The end state: other apps embed ID pieces as libraries (see MCP, §3).
- A standard capability set tied to Roc libraries — one capability catalogue, programmed
against once, implemented by every host (Rust native, web/WASM, Android, ESP32). Each
capability: name, signature, purity class, fuel cost model, failure modes, per-platform notes.
- Pure vs impure app definitions — formalize the split: pure definitions (deterministic,
replayable, fuel-metered) vs impure/hosted effects; how the split shows up in the type system,
the wire format, and the permission prompt a user sees.
- Tokens: a generic trading/market system; tokens tied to app fuel and in-app items — prior
art: Agoric ERTP (Mint/Issuer/Brand/Purse/Payment with framework-enforced conservation) + Zoe
(escrow, offer safety, metering); Wasmtime consume_fuel as the deterministic metering
primitive beneath any fuel token. Convergent shape: metered execution → conserved asset
objects → capability-held, attenuable/revocable budgets — one design unifying app fuel,
in-app items, and trades. Build on the existing currency work (epic: ID platform expansion — apps, comms, currency, hosting, boards (2026-10-28 directive, LIST 6–15) #2056 currency sub-issues,
id-currency-registry, hosted-worker currency) — do not start a second currency design.
- Sprites and basic text/2D games (Dwarf Fortress, Space Invaders, Dig Dug), basic
simulations, sketching, mind mapping — the first-app suite that proves the platform: each is
a design + a working app, exercising sprites, text grids, input, timing, persistence.
- Visualizing and searching the ID object graph — Cytoscape.js (analysis, algorithms,
compound nodes) vs Sigma.js v3 + Graphology (WebGL scale); internal model = property graph,
interchange = JSON-LD at the boundary. Search = the Atlas thread (§3).
- Embeddings for search — the Atlas project baked in — derived-index pattern: index keyed by
content hash + model_id; query → KNN → graph expansion → rerank/RRF fusion; the index is
rebuildable, never a source of truth. Storage: libSQL/Turso native vectors (F32_BLOB +
DiskANN vector_top_k) — sqlite-vec can't load on remote sqld. Local models via fastembed-rs
(ONNX) or candle. Coordinate with the Atlas program prompt — the two programs meet here.
- Bevy platform support and ECS for complex simulations —
bevy_ecs is usable standalone;
headless server = bevy with default-features=false + MinimalPlugins + ScheduleRunnerPlugin.
ECS consumes projections of the graph; it never owns the graph. Build on id: design: Bevy incorporation — ID worlds as Bevy applications (ECS mapping of the entity/triple model) #5781 and the landed
Bevy shell (id: rich presentation surfaces — versioned scene/audio/widget contract extension + Bevy renderers (F13.6 follow-on) #12657 step 2a).
- Cleaner server/client capability separation — one node binary, capability profiles:
what a pure rendering client holds vs a storage/signing node vs a hosted backstop.
- Full OCapN and CRDT support — OCapN (Spritely: CapTP, Syrup,
ocapn:// sturdyrefs,
netlayers) is pre-standardization and protocol-unstable, with Guile/Racket reference
implementations and no production Rust implementation found: adopt the semantics (promise
pipelining, distributed GC, certified third-party handoffs) into ID's Rust cap layer; track the
standard, don't block on it. CRDTs (Loro — Fugue text, MovableTree, full history DAG, closest
to event sourcing; Yrs — Yjs ecosystem/wire compat; Automerge — git-like change DAG, per-change
attribution) sign nothing and enforce no capabilities: they sit inside ID's signed-event
envelope, for content convergence only. Decide per content class which engine (or ID's own log)
applies.
- Distinguish the major components: pure clients rendering the graph; content-addressed
storage; signing; the iroh-native approach (dial-by-public-key QUIC; iroh-blobs = BLAKE3
CAS transfer; iroh-gossip = live notification only, no catch-up; iroh-docs = signed KV,
NamespaceId as write capability, range-based set reconciliation — the closest existing shape
to ID's store; weigh adopt-vs-mirror per component).
- Text/property objects as structured data; binary formats (images/video) — object model
completion: typed properties, schemas, migrations; media objects with streaming, thumbnails,
and capability-gated decode.
- MCP, and using each part as a library in other apps — MCP servers sit behind ID's
capability layer (MCP's own auth is young; tool hints are untrusted; calls arrive holding a
capability). Every major component ships as a library with a stable API; the binary is one
composition of them.
- One distributed federated graph — servers and clients are technically the same thing with
different platforms/capabilities. Any design that forks "the server version" from "the client
version" of a concept is wrong; fix the design.
3. Workstreams (run in parallel; each owns its issues end to end)
- A. Charter & architecture — write the missing charter (purpose, principles, component map);
reconcile ARCHITECTURE.md with the code as it is; produce the core architecture diagrams
(mermaid in the book; SVG/graphviz where mermaid can't carry it): component map, event/object
lifecycle, capability flow, federation topology, app execution (pure core ↔ hosts).
- B. Design completion & new designs — review and organize all existing designs in the
doc/ archive and the 41 open kind/design issues; touch up and improve every one (current
terminology, links, status, open questions resolved or explicitly parked); create the missing
designs for the obvious next steps — v1 ideas taken to a fully featured platform, not an
MVP: identity & key recovery, namespaces, permissions UX, offline/merge semantics per
content class, media pipeline, app distribution & updates, developer tooling, observability.
- C. Capability platform & Roc — the standard capability catalogue (§2); the Roc platform
definition + host matrix (Linux first, Android second per priority); I/O equivalency rules;
pure/impure formalism; fuel metering per capability.
- D. Data, graph & search — object/property model completion; graph visualization &
navigation (Falcor-model path API); Atlas integration design (design(id/atlas): ID-graph publication format — Atlas objects + provenance/lineage relations as ID-graph objects #6062 + projectors impl(atlas/id): projector — versions, files, relations emission (#6062 follow-on 1) #11182–impl(atlas/id): ID-graph publication conformance audit (#6062 follow-on 5) #11186
- E. Tokens & fuel economy — ERTP/Zoe-shaped asset design on Wasmtime fuel metering;
market/trading mechanics; in-app items; budgets as capabilities; abuse/Spam economics.
- F. Clients, games & simulations — mockups/sketches (ASCII + rendered) of how the system
looks now and how next steps will look; the first-app suite (text/2D games, sims, sketching,
mind mapping) as designs + working apps; Bevy ECS simulation tier; sprite/text-grid rendering
across TUI/GUI/Android hosts.
- G. Federation & protocols — OCapN semantics adoption plan; wire format (#567x); relay/
messaging v1 (id: design: ID messaging/relay protocol v1 #2036); attestation/audit (id: design: match attestation + audit v1 #2039); iroh component decisions; hosted backstop
parity proofs (p2p ≡ hosted, tested).
- H. Implementation — begin every unblocked slice the designs unlock, in dependency order;
small PRs, verified, merged. Designs that can't be implemented yet get a filed, linked
implementation issue with a named next action — nothing sits silently.
4. Deliverables (the program is done when these exist and stay current)
- A comprehensive document series in book form — an ID book built with the bookwright
method (survey before structure; coordinator-fixed skeleton; mechanical coverage proof;
zero-warning build), joining the existing code-repo Pages deploy under
https://developing-today.github.io/code/id/ (one Pages site per repo — never a standalone
deploy). Sources in pkgs/id/book/ + pkgs/id/book.toml, built by a flake package like
pkgs/fleet/docs.nix. Include a DOC-01-style docs-sync contract in pkgs/id/README.md:
any crate/capability/protocol change updates its chapter in the same change. The fleet book
(https://developing-today.github.io/code/fleet/) is the form reference.
- An issue-by-issue map of ALL ID issues — every open
app/id / epic/id-program /
epic/id-platform issue, prioritized in best working order, with all blockers marked both
on the issues themselves and in the priority list (a chapter in the book + the tracking
issue kept current). Blockers are worked, not just listed: when a blocker is itself workable,
it goes first.
- Many designs — completed, improved, and new (§3B/§3C/§3E), each landed in the
doc/
archive by PR and linked from the book.
- Many PRs merged — implementation slices (§3H), docs, and the book itself; CI runs on main
only; merge when verified.
- Diagrams & mockups — architecture diagrams (§3A) and UI/interaction mockups for current
state and next steps (§3F), embedded in the book.
5. How to work (fleet rules — binding)
- GitHub via the gh CLI / REST only (the GitHub connector is banned). File a GitHub issue in
the owning repo the same pass for any problem found; naming it in a doc is not a substitute.
- Execution on the laptop (
~/git/code primary stays on main + clean; all work in worktrees
on branches, landed by PR). Never git stash in shared clones. Never force-push main.
- Before implementing any issue: premise check (is it still true on current main?) +
singular-ownership check (fresh reads; a claim comment from another agent is a hard stop).
Re-read an issue's newest comments immediately before merging its PR.
- Builds/tests dispatch-first (
fleet queue dispatch), laptop fallback; a container environment
failure is not a test result — record which route verified. Tests name their oracle.
- Evidence standard: every factual claim carries its checked source or is labelled unverified;
counts computed from a named source, never estimated in prose.
- Respect standing holds: items flagged as awaiting Drew's item-specific approval are not
yours to start (the scale chain's id(phase-14): join-time benches — cold and warm join at stress tiers #13084 is one). Items needing Drew's decision get surfaced
with the decision's substance (options, ramifications, recommendation) — never re-ask a
decision he already recorded.
- Secrets by name only, never values. Never touch the
vertexinc org. External communications
(anything outside our own repos/channels under Drew's identity) need per-item pre-approval.
- Quota doctrine: plan quotas only, never funds; a 402 is a wall; burn-by-expiry; measure before
large burns.
6. The iteration rule
This prompt is the starting point. When every workstream has reported, do not conclude:
re-survey (issues, designs, code), reconcile what the passes learned, expand the design set and
the issue map, and run the next pass. The program ends only when a full pass finds nothing more
that can be designed, documented, or implemented with the authority available — and even then,
the book, the issue map, and the docs-sync contract remain as the living record the next pass
starts from. dezren39 commented on Nov 23, 2026 Claiming this for the starter PR (Lane UI, via Archer): bringing the full investigation prompt (first comment on this issue) into the repo as a document in the doc/ archive, plus a short program index entry linking this issue, #2056, and #9106. Docs-only PR; will post the PR link and merge SHA here when done. dezren39 commented on Nov 23, 2026 Starter PR done (Lane UI): PR #13243 merged — merge commit af119693476daf90adf2a7e1689404d876c08c97, head SHA-guarded at 2104be5b15bd9176b85c3afa15f28742143a68da.
What landed:
doc/2026-11-23T12-06-42Z_design_id_program_investigation_prompt/2026-11-23T12-06-42Z_design_id_program_investigation_prompt.md — the full program prompt from this issue's first comment, verbatim (18,904 bytes; sha256 39d36cf8c9996283f74f6f0134f0c1a7b1c95a1e9a659a79c0cec5bc04b4feb1, re-verified against main after merge). Placed as a dated design record per the archive convention documented in doc/README.md (doc/<UTC>_<kind>_<name>/ folder holding a same-named .md).
doc/README.md — one starting-points bullet in the Dated records section.
pkgs/id/README.md — a short "ID program" subsection under Documentation linking the prompt, this issue, epics epic: ID platform expansion — apps, comms, currency, hosting, boards (2026-10-28 directive, LIST 6–15) #2056 and epic: ID/Atlas extensible primitives, federation, namespaces — major design iteration (2026-11-12 directive) #9106, and the deliverables (ID book under /code/id/; prioritized, blocker-marked map of all ID issues).
Docs-only: 3 Markdown files, additions only. This issue stays open as the program's tracking home. dezren39 commented on Nov 23, 2026
I am working on the research and development supplement to the existing ID book on AMD, branch docs/id-rd-13240-20261123. The scope is the new research section, source and fixture evidence, the live issue map and implementation plan, with navigation from the existing book. The original 67 chapters and combined Pages pipeline landed in #13358. The release check for this addition is a Fleet-dispatched mdBook build plus chapter, link and artifact coverage. Other design and implementation work on this program remains independently owned. dezren39 commented on Nov 23, 2026 Issue map and dependency reconciliation — November 23, 18:06 UTC
Authenticated GitHub REST on AMD returned 201 open app/id, 182 open epic/id-program and 35 open epic/id-platform issues, 216 distinct issues after union and PR exclusion. All 216 map rows have a proposed proof or decision, current label evidence and a checked latest-comment link. The 14:15 UTC census also had 216 members, but ten entered and ten closed. The public source is being integrated under the book supplement claim on the book branch; its prior 67-chapter release already serves on combined Pages.
| Changed membership |
Issue IDs |
| Added |
#13403, #13522, #13523, #13524, #13525, #13540, #13542, #13543, #13558, #13564 |
| Closed/completed |
#2249, #2381, #3797, #3818, #7717, #9119, #9144, #11776, #11778, #13084 |
Seven missing native blocker links were added and read back. #13088 is blocked by #13087. #13523 is blocked by #13522. #13524 is blocked by #13522 and #13523. #13525 is blocked by #13522, #13523 and #13524. These reflect prerequisites already stated in the corresponding issues or comments. The snapshot lists 44 native relationships, including completed prerequisites, and identifies additional text-only dependencies separately.
The chapter and JSON retain stable issue numbers and order prerequisites before their open dependents. The final build, merge and deployment of this supplement require their own receipts. dezren39 commented on Nov 26, 2026 Triage verdict (lane code-i)
Verdict: Needs real implementation work — not a small fix.
This is a program-scale effort (priority/normal) — the ID program: full investigation, design completion & build-out. It is the tracking/home issue for the ID project (pkgs/id), not a single fix. It cannot be resolved with a small edit or closing keyword.
Assessment:
- Well-formed: the issue carries the full program prompt (ground truth, research threads, workstreams A–H, deliverables, fleet rules) as its first comment; extensive owner comments already on record.
- Already in progress: starter PR doc: ID program investigation & build-out prompt (#13240) #13243 merged (prompt brought into
doc/ archive as a dated design record); book supplement on branch docs/id-rd-13240-20261123 (67-chapter base release docs(id): the id book — 67 chapters at /code/id/ (#13332) #13358 already on combined Pages); issue map and dependency reconciliation for 216 ID issues recorded.
- Label:
status/in-review is correctly set — program work is actively in review/progress.
- Scale: 208 open
app/id, 191 epic/id-program, 36 epic/id-platform issues; 44 blocked, 41 design. Epics epic: ID platform expansion — apps, comms, currency, hosting, boards (2026-10-28 directive, LIST 6–15) #2056 (27/29 closed) and epic: ID/Atlas extensible primitives, federation, namespaces — major design iteration (2026-11-12 directive) #9106 (Parts A/B/C). Depends: epic: ID platform expansion — apps, comms, currency, hosting, boards (2026-10-28 directive, LIST 6–15) #2056, epic: ID/Atlas extensible primitives, federation, namespaces — major design iteration (2026-11-12 directive) #9106; scale program id(phase-14): Scale & performance hardening — v1 — first-iteration design #6304. Baseline census verified 2026-11-23.
Next: Continue the program workstreams (charter & architecture, design completion, capability platform & Roc, data/graph/search, tokens & fuel, clients/games/sims, federation & protocols, implementation) per the issue's operating rule — each workstream owns its issues end to end, in dependency order. The book, issue map, and docs-sync contract remain as the living record.
Triage recorded by lane code-i (task 23934), 2026-11-26. developing-today-fleet commented on Nov 26, 2026 Triage verdict (lane GE, queue task 24599)
Verdict: Needs real implementation work — not a small fix. Confirms the prior triage (task 23934, 2026-11-26 12:57 UTC); no material change since.
- Premise/ownership check (2026-11-26 23:17 UTC claim): issue is OPEN, sole label
status:in-review — no held/user label, no Drew-decision gate, and no live competing claim on the triage itself. The 2026-11-23 book-supplement note is a scoped sub-claim (branch docs/id-rd-13240-20261123) and states other programme work remains independently owned.
- This is the programme tracking/home issue for the ID project (
pkgs/id): full investigation, design completion and build-out, with deliverables spanning a book series, an issue-by-issue map of all ID issues, many design PRs, implementation slices in dependency order, and architecture diagrams/mockups. It cannot be closed by a small edit or a closing-keyword PR.
- Already landed: starter PR doc: ID program investigation & build-out prompt (#13240) #13243 merged (programme prompt into the
doc/ archive); 67-chapter book base in docs(id): the id book — 67 chapters at /code/id/ (#13332) #13358 on combined Pages; issue map / dependency reconciliation for 216 distinct ID issues recorded 2026-11-23.
- Scale on record: epics epic: ID platform expansion — apps, comms, currency, hosting, boards (2026-10-28 directive, LIST 6–15) #2056 (27/29 closed) and epic: ID/Atlas extensible primitives, federation, namespaces — major design iteration (2026-11-12 directive) #9106 (Parts A/B/C), scale programme id(phase-14): Scale & performance hardening — v1 — first-iteration design #6304; ~208 open
app/id at baseline census.
Next: Programme work continues through its own workstreams/coordinator lanes, each owning its constituent issues end to end in dependency order — not as a single 45-minute lane item. This triage task (24599) is completed on this verdict; the issue stays open as the programme home.
Triage recorded by lane GE (task 24599), 2026-11-26. developing-today-fleet commented on Nov 26, 2026 🤖 Agent note (lane code-j, 2026-11-26, triage task 25097): programme tracker — needs real implementation work, no small-fix packet.
- Fresh readback: OPEN, sole label status/in-review. Concurs with the 2026-11-26 code-i/GE triages: program-scale investigation/design/build-out home for pkgs/id, not a single fix.
- Stays open as the programme record; component slices carry the work. Refs epic: ID platform expansion — apps, comms, currency, hosting, boards (2026-10-28 directive, LIST 6–15) #2056, epic: ID/Atlas extensible primitives, federation, namespaces — major design iteration (2026-11-12 directive) #9106, Queue reprioritization programme 2026-11-24: full census, reorder, unblock #14158.
developing-today-fleet commented on Nov 27, 2026
Coverage-reconciliation triage (task 25857): #13240 remains the open ID program tracker, not a small-fix work item. The prior triage verdicts on this issue (tasks 23934, 24599, 25097) remain current: broad investigation/design/build-out is split across existing workstreams and child issues. No new small-fix packet or duplicate follow-on is appropriate; the program continues on its existing streams.
MetadataMetadataDevelopmentNo branches or pull requestsIssue actions
|